The machine will be placed on the side of the slope plate having a pin hole [1]. Be sure that the space will be on this
side (left side).
The side of the slope plate having a pin hole (left) is where the delivery side of the machine will be, with the front of
the machine facing the side indicated by the arrow.
[1]
F-2-3
2.1.2 Installation Environment
Be sure that the environment of the site meets the following requirements:
(%RH)
80
75
60
[1]
40
25
20
10
0
(32)
F-2-4
[1] Humidity
[2] Temperature
Front
10
15
20
(50)
(59)
(68)
[2]
30
˚C
(86) (˚F)
Chapter 2
0002-6399
2-3