B R
NV3500 MANUAL TRANSMISSION
21 - 45
(20) Apply bead of Loctite Ultra (heavy body),
black silicone sealer (or Mopar equivalent), to flange
surface of front bearing retainer. Then apply bead of
same sealer to retainer mounting surface of front
housing (Fig. 141).
Fig. 141 Applying Sealer To Bearing Retainer And
Housing
(21) Align and install front bearing retainer over
input shaft and onto housing mounting surface (Fig.
142). Although retainer is one-way fit on hous
ing, be sure bolt holes are aligned before seat
ing retainer.
Fig. 142 Installing Input Shaft Bearing Retainer
(22) Install and tighten bearing retainer bolts to
7-10 N-m (5-7 ft. lbs.) torque (Fig. 143).
(23) Install transmission in vehicle. Then refer to
shift lever installation procedure.
Fig. 143 Installing Input Shaft Bearing Retainer
Bolts
SHIFT
TOWER AMD
LEVER
ASSEMBLY
INSTALLATION
(1) Apply 1/8 to 3/16 in. wide bead of Mopar Gas
ket Maker, or Loctite 518 to isolator and plate mat
ing surface of rear housing (Fig. 144).
Fig. 144 Applying Sealer To Shift Tower Mounting
Surface