Dodge RAM TRUCK 1500 1995 Service Manual page 1479

Table of Contents

Advertisement

21 - 198
42RH TRANSSVilSSION OVERHAUL
Fig.
139 Case
Gasket
installation/Alignment
(14) Install overdrive piston retainer. Be sure gover­
nor tube bores in retainer are aligned with governor
feed passages in gasket and case (Fig. 140). Install and
tighten retainer bolts to 17 N-m (13 ft. lbs.) torque.
Fig.
140 Overdrive Piston
Retainer
installation
(15) Install snap ring that secures low-reverse
drum to hub of piston retainer (Fig. 141).
(16) Install rear band lever and pivot pin (Fig.
142). Align lever with pin bores in case and push
pivot pin into place.
(17) Install planetary geartrain assembly (Fig. 143)
Fig. 142 Rear Band
Lever
And Pivot
Pin
Installation
(18) Install thrust plate on intermediate shaft hub
(Fig. 144). Use petroleum jelly to hold thrust plate in
place.
(19) Check seal ring on rear clutch retainer hub
(Fig. 49) and seal rings on input shaft (Fig. 145). Ver­
ify that diagonal-cut ends of teflon seal rings are
properly joined and ends of metal ring are correctly
hooked together. Also verify that shaft seal rings are
installed in sequence shown.
(20) Check rear clutch fiber thrust washer (Fig.
146). Use additional petroleum jelly to hold washer
in place if necessary.
(21) Align clutch discs in front clutch and install
front clutch on rear clutch (Fig. 147). Rotate front
clutch retainer back and forth until completely
seated on rear clutch.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ram truck 3500 1995Ram 1995

Table of Contents