Tadiran Telecom Emerald ICE Installation & Maintenance Manual page 97

Digital key telephone system
Hide thumbs Also See for Emerald ICE:
Table of Contents

Advertisement

5-8
Emerald ICE Installation, Programming & Maintenance Manual
5. When all changes are complete, press the Volume button (
return to the  DB Item Select Screen  or exit programming. 
RMP Programming
1. Access the  RMP  using the procedures described in  Section 3.3.  
2. Select  RP, Extension  from the toolbar to display the following window.
3. Using the drop‐down list in the  Extension  field, select an extension to 
program.
4. Using the drop‐down lists in the  Day Class  and  Evening Class  fields, 
select a  Day Class:  COS and/or an  Evening Class:  COS for the  Extension  
selected using the drop down lists in the respective fields. 
5. Click on the  Update  button, follow the prompts and repeat steps 3 through 
5 for other extensions, as necessary.
6. Continue other programming or click on the  Close  button to close the 
window without making changes or click on the  Update  button and follow 
the prompts to save the database changes. 
v
) to 

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Emerald ICE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents