12-10
Emerald ICE Installation, Programming & Maintenance Manual
Copy multiple CO Line(s) via Group:
8. Enter 08-11-02 and press the softkey beneath save . This advances to
the GROUP COPY programming screen.
9. Press the softkey beneath show . The system prompts for the CO Line that
should be copied ‐ COPY FROM .
10. Enter the CO Line directory number of the CO Line that has been
programmed for copying to other CO Lines and press the softkey beneath
save . The system prompts for the CO Line Group directory number
where the source data is to be copied‐ COPY TO .
11. Enter the CO Line Group directory number (9, 800‐806) where the copy
data should be stored and press the softkey beneath save . The copy data
is stored in all CO Lines that are part of that CO Line Group. At this time
the system prompts for the next CO Line Group directory number where
the source data is to be copied‐ COPY TO .
12. Continue enterting CO Line Group directory numbers where the copy data
should be stored and press the softkey beneath save for each entered
directory number.
13. When finished programming CO Lines via the Group Copy function, press
the Volume button (
programming.
v
) to return to the DB Item Select Screen or exit
Need help?
Do you have a question about the Emerald ICE and is the answer not in the manual?
Questions and answers