5. Press the Hold button (
or press the Volume button (
and enter another CO Line.
6. Press the softkey beneath show .
7. Press the softkey beneath next twice to advance to the CO Line Group
programming for the CO Line selected.
8. When finished programming CO Line Groups, press the Volume button
v
(
) to return to the DB Item Select screen or exit programming.
RMP Programming
1. Access the RMP using the procedures described in Section 3.3.
2. Select RP, CO Line from the menu bar to display the following window.
Program extensions for CO Line Access.
3. Using the drop‐down list in the CO Line field, select a CO line to program.
4. Using the drop‐down list in the Route: field, select a CO line group to
associate with the selected CO line. The CO line being programmed is
assigned 1 of 8 CO Lines or Trunk groups.
5. Click on the Update button, follow the prompts and repeat steps 3 and 4
for other CO lines, as necessary.
h
) to select another CO Line to be programmed
v
) to return to the DB Item Select screen
Emerald ICE Installation, Programming & Maintenance Manual
6-9
Need help?
Do you have a question about the Emerald ICE and is the answer not in the manual?
Questions and answers