Micromeritics ASAP 2020 Confirm Operator's Manual page 347

Developer/analyst
Table of Contents

Advertisement

Appendix B
6524-
(Unit [number]) Analysis canceled: Time limit exceeded while evacuating sam-
ple (restricted).
Cause:
Action:
6525-
Power failure lasted too long.
Cause:
Action:
6526-
Time limit exceeded while backfilling manifold to [PR4] [PR-U] with [G].
Cause A:
Action A:
Cause B:
Action B:
202-42811-01 - Mar 2011
The maximum time for evacuating the sample through the restricted
valve was exceeded. Possible causes are a leak in the sample tube fit-
ting, a crack in the sample tube, or a poorly degassed sample.
Check the sample tube and the sample tube fitting; ensure that the tube
is securely attached to the port. Verify that the sample is properly
degassed; then restart the analysis
A power failure on an anlyzer which has an Uninteruptible Power Sup-
ply attached has lasted for an hour or more; therefore, the analysis has
been canceled.
Determine the cause of the power failure and correct it.
The maximum time was exceeded before the target pressure point was
reached. The gas regulator may be set too low or turned off.
Set the gas regulator to 10 psig (0.7 bar). Then resume the analysis.
The gas bottle is empty.
Connect a new gas bottle. Then resume the analysis.
ASAP 2020 Confirm
B-53

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ASAP 2020 Confirm and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF