Micromeritics ASAP 2020 Confirm Operator's Manual page 24

Developer/analyst
Table of Contents

Advertisement

ASAP 2020 Confirm
Heating mantle
power connector
Heating mantle
breaker
Cold Traps
High vacuum pump
indicators
Sample port
Po port
2-4
Allows connection of the heating mantle power cord (one
for each heating mantle).
Protects the circuitry for the heating mantle in the event of a
failure (one for each heating mantle). If the circuit breaker
trips (pops out), call your Micromeritics service representa-
tive.
Two cold traps are provided; one for degassing and one for
analysis.
Illuminate when the high vacuum pump(s) is(are) operating
at normal speed. The left indicator is for degas operations
and the right one for analysis.
For installing the sample tube containing the material you
wish to analyze.
For installing a Po (saturation pressure) tube when perform-
ing physisorption analyses.
Controls, Indicators, and Connectors
202-42811-01 - May 2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ASAP 2020 Confirm and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF