Routine Maintenance
4. Click
Next
of messages is displayed. These messages are of the following types:
• Informative; for example, advising how long the test will take or how long before you
will be required to open or close a valve. Read the message and click
• Operator response; for example, you will be asked to open and close regulator and gas
bottle valves (depicted below). Perform the task first, then click
Regulator Shut-Off valve
5. After the test is finished, a dialog stating the test is complete is displayed; click
close the dialog.
6.
A report is generated automatically to the screen.
Observe the Rate of Change on the Outgas/Leak Rate of the Gas Line report; it should
202-42811-01 - Mar 2011
; the second view of the Service Test dialog is displayed. On this dialog a series
Low-pressure gauge
ASAP 2020 Confirm
to proceed.
OK
.
OK
Gas Bottle Shut-Off valve
Regulator Control knob
to
OK
8-23