Micromeritics ASAP 2020 Confirm Operator's Manual page 23

Developer/analyst
Table of Contents

Advertisement

Controls, Indicators, and Connectors
High vacuum pump
Elevator
The components listed here are located on the underside of the upper extension of the front
panel.
Heating Mantle Power Connector
Degas Port
Heating Mantle
Breaker
Degas ports
Heating mantle
thermocouple
202-42811-01 - May 2012
A high vacuum pump is used when dry evacuation methods
are required. Connections, as well as an on/off (breaker)
switch, are located on the front right side of the analyzer
beneath the work surface. Remove (or fold over to the left)
the rubber mat from the work surface and lift off the metal
cover.
Indicator lights (located on the underside of the upper exten-
sion of the front panel) illuminate when the high vacuum
pump is operating.
Allows placement of the Dewar around the sample tube.
Cold Traps
Heating Mantle Thermocouple
Connector
Allows you to degas up to two samples. Each degassing port
has connections for a heating mantle.
Allows connection of a heating mantle (one for each degas
port).
ASAP 2020 Confirm
Sample Port
High Vacuum
Pump indicators
Po Port
Four hangers are provided for
placement of safety shields.
2-3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ASAP 2020 Confirm and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF