ABB AC500-S Safety User Manual page 165

Hide thumbs Also See for AC500-S:
Table of Contents

Advertisement

Libraries sec-
After the project information section and safety device sections, the SVT checklist continues
tion
with a libraries section.
Fig. 83: Example of the libraries section
End of SVT
After the libraries section, the SVT checklist ends with the line End of SVT checklist and,
checklist
after that, optional fields like date, signature, etc.
Fig. 84: End of SVT checklist with optional fields
4.3.7.1.2
How to run SVT
1.
2.
3.
4.
2020/06/19
System configuration and programming > Checking of program and system configuration
In Automation Builder, go to the safety CPU application node, e.g., "AC500_S" .
Right-click the node to open the context menu.
Select "Create Safety Configuration Data" .
Select "Verify Safety Project Integrity" .
NOTICE!
The "Verify Safety Project Integrity" command may not be active, e.g.,
when the CODESYS Safety project is open or when you did not run
"Create Safety Configuration Data" command before.
Save and close the CODESYS Safety project before you use SVT.
3ADR025091M0208, 12, en_US
Configuration and programming
165

Advertisement

Table of Contents
loading

Table of Contents