New Holland WorkMaster 50 Service Manual page 188

Tier 4b (final)
Hide thumbs Also See for WorkMaster 50:
Table of Contents

Advertisement

9. Install 2nd gear onto the synchromesh driven shaft and
secure 2nd gear with a snap ring (1).
10. Install the hub (1) 1st/2nd gear coupler (2) onto the
driven shaft and insert the shift fork (3) onto the cou-
pler. Secure the hub with the snap ring (4).
NOTE: Keep the face of the hub with the cut towards the
pinion side.
11. Secure the shift fork in place by inserting the bottom
shift rail (1).
NOTE: Insert the M12 plug (2) for the shift rail into the hous-
ing.
Transmission - Gearbox internal components
47866583_ 02/12/2015
21.4 [21.145] / 25
9
GNIL14TR04192AB
10
GNIL14TR04193AB
11
GNIL14TR04194AB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workmaster 60Workmaster 70

Table of Contents