New Holland WorkMaster 50 Service Manual page 174

Tier 4b (final)
Hide thumbs Also See for WorkMaster 50:
Table of Contents

Advertisement

26. Attach the cable on the linkage and secure with the
snap ring (1).
27. Attach the linkage to the shaft link rod. Secure using
the pin and cotter pin.
Synchro shuttle rails and fork
28. To install the shift rail and shift forks follow the proce-
dure as mentioned below.
29. Insert shuttler rail.
30. Insert the bottom shift rail (1) and 1st/2nd gearshift
fork. Insert the snap ring (2) on the bottom shift rail
and ensure it sits on the seat in housing.
31. The Hi/Low shift rail (1) shift fork and shift gate should
be installed after the pinion and crown settings.
NOTE: Keep grooves of rails upward to make easy fitment
of balls and springs.
Transmission - Gearbox internal components
47866583_ 02/12/2015
21.4 [21.145] / 11
13
GNIL14TR04223AB
14
GNIL14TR04227AB
15
GNIL14TR04228AB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workmaster 60Workmaster 70

Table of Contents