Calibration
Power Calibration
Preparing to control the power meter
When acquiring power calibration data, the power meter is controlled via GPIB from the
E5070B/E5071B.
To control the power meter from the E5070B/E5071B, connect the USB port of the
E5070B/E5071B and the GPIB connector of the power meter through the USB/GPIB
interface as shown in Figure 4-61 and set the GPIB address of the connected power meter
with the E5070B/E5071B.
NOTE
The USB/GPIB interface must be ready to use. For more information, see "Setting the
GPIB" on page 426.
Setting GPIB address of the power meter
Use the following procedure to set the GPIB address of the power meter:
Step 1. Press
Step 2. Press
Step 3. Press
Step 4. Press
Step 5. Enter the GPIB address of the power meter you are using.
Figure 4-61
Connection between power meter and E5070B/E5071B
210
.
.
Misc Setup
.
GPIB Setup
.
Power Meter Address