8
Sys Burst Tests
Test 2.3.4-SYS-RX Differential Termination Enable Time (T
Purpose
Procedure
Connection Diagram
Parameters
278
It is available for all hardware configurations in Termination mode.
This test verifies that the SYS-RX enables the termination with in the
required time.
The data generator sends Burst-mode SYS CJTPAT signaling with nominal
amplitude settings while the DUT is configured for Terminated-mode.
Then, the T
TERM-ON-SYS-RX
is measured using a real-time oscilloscope. Among all measured
T
values, the maximum and minimum T
TERM-ON-SYS-RX
values are considered as the final results.
The test will pass if the maximum T
PREPARE time defined by the DUT´s LS_PREPARE_Length_Capability
attribute (see
Table
42).
This test is performed at each selected lane.
Refer to the connection diagrams shown in the Connection Diagram
section of the Test 2.1.4-HS-RX Differential Termination Enable Time test.
The parameters used in Expert Mode for this test, are as follows:
•
CDR Loop Bandwidth (if CDR is selected in the Special Parameter
dialog, see
"BERT Analyzer
•
CDR Peaking (if CDR is selected in the Special Parameter dialog, see
"BERT Analyzer
Settings")
•
CDR Transition Density (if CDR is selected in the Special Parameter
dialog, see
"BERT Analyzer
•
CDR Loop Order (if CDR is selected in the Special Parameter dialog,
see
"BERT Analyzer
•
Semi Automated Test
•
Set Single Ended Amplitude
•
Set Offset
TERM-ON-SYS-RX
(PWM-RX differential termination enable time)
TERM-ONSYSM-RX
Settings")
Settings")
Settings")
Keysight N5990A MIPI M-PHY Receiver Test User Guide
)
TERM-ON-SYS-RX
value is less than the