Transducer Installation; Specs For Din Rail Mounting; Din Rail (Slotted) Dimensions; Transducer On Din Rail - Electro Industries Shark 200 Installation & Operation Manual

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

3.4: Transducer Installation

Use DIN Rail mounting to install the Shark® 200T transducer.

Specs for DIN Rail Mounting

International Standards DIN 46277/3

DIN Rail (Slotted) Dimensions

0.297244" x 1.377953" x 3" /.755 cm x 3.5 cm x 7.62 cm
1. Slide top groove of meter onto the DIN Rail.
2. Press gently until the meter clicks into place.
NOTES:
• To remove the meter from the DIN Rail, pull down on the Release Clip to detach the
unit from the rail (see Figure 3.7).
• If mounting with the DIN Rail provided, use the black rubber stoppers, also
provided (see Figure 3.8).
NOTE ON DIN RAILS: DIN Rails are commonly used as a mounting channel for most
terminal blocks, control devices, circuit protection devices and PLCs. DIN Rails are
made of electrolytically plated cold rolled steel and are also available in aluminum,
PVC, stainless steel and copper.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
Release Clip
Figure 3.7: Transducer on DIN Rail
Doc
3: Mechanical Installation
#
E149701
3-6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents