4.2: CT Leads Terminated to Meter

The Shark® 200 meter is designed to have current inputs wired in one of three ways.
Figure 4.1 shows the most typical connection where CT Leads are terminated to the
meter at the current gills. This connection uses nickel-plated brass studs (current
gills) with screws at each end. This connection allows the CT wires to be terminated
using either an "O" or a "U" lug. Tighten the screws with a #2 Phillips screwdriver. The
maximum installation torque is 1 Newton-Meter.
Other current connections are shown in figures 4.2 and 4.3. Voltage and RS485/KYZ
connections are shown in Figure 4.4.
Figure 4.1: CT Leads Terminated to Meter, #8 Screw for Lug Connection
Wiring Diagrams are shown in Section 4.8 of this chapter.
Communications connections are detailed in Chapter 5.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
4: Electrical Installation
#
Doc
E149701
4-4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents