Electro Industries Shark 200 Installation & Operation Manual page 172

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

• The number of retries you want to implement in the case of a failed first attempt,
which may happen if network traffic is heavy.
5. Click Next. You will see the webpage shown below.
6. In the Serviced Gateway webpage, enter:
• Enter the Gateway URL of the data service to connect with - this will be supplied
by the cloud service.
• The Gateway ID/Path is the unique identifier for this meter. It is supplied by the
meter and cannot be changed - the field is display only.
• Enter the minute interval for sending the catalog (which tells the server which
readings will be sent) to the server. Note that since the catalog is sent automat-
ically when the meter starts up, which includes after any changes to the config-
uration, so you don't need to make this a small interval. EIG recommends that
you set this value at 1440 minutes, which is once a day.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
8: Using the INP100S Network Card
#
Doc
E149701
8-22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents