Din Installation - Electro Industries Shark 200 Installation & Operation Manual

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

3. Secure meter to panel by using a #2 Phillips screwdriver to tighten the screw on
each of the two mounting brackets. Do not overtighten: the maximum installation
torque is 0.4 Newton-Meter.
Top mounting
bracket groove
DIN mounting
Bottom
bracket
mounting
bracket groove
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions

DIN Installation

DIN Mounting brackets
Figure 3.6: DIN Installation
#
Doc
3: Mechanical Installation
92mm Square
form
Remove (unscrew) ANSI studs
for DIN installation
E149701
3-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents