10. Service: Current Only Measurement (Single Phase)
LINE
A
N
N
A
LOAD
Select: "3 EL WYE" (3 Element Wye) he Shark® meter's front panel display (see
Chapter 6).
NOTES:
• Even if the meter is used only for current measurement, an AN reference is recom-
mended for improved accuracy.
• The diagram shows a connection to Phase A, but you can also connect to Phase B or
Phase C.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
CT
Shorting
Block
Earth Ground
4: Electrical Installation
GND
L(+)
N(-)
lc
lb
la
Vref
Va
Vb
Vc
#
Doc
E149701
Power
Supply
Connection
FUSE
L(+)
3A
N(-)
20VAC
FUSE
Minimum
0.1A
4-20