Electro Industries Shark 200 Installation & Operation Manual page 345

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

7. Fill in the upload password: the default is n3tUp!0Ad for firmware runtime version
3.35 and later; and eignet2009 for earlier firmware runtime versions. See the note
on page E-22.
8. Click Submit. The upload process begins. When the upload is finished a report is
shown on the screen.
IMPORTANT NOTES!
• The IP address configured into the IEC 61850 Protocol Ethernet Network card with
the Communicator EXT™ software must be the same as the IP address configured
in the .cid file. This is necessary to insure proper communication. If there is a com-
munication problem it will be reported on the IEC 61850 Protocol Ethernet Network
card's Meter Information screen, shown in step 1 on page E-22.
• The maximum size of the .cid file is 250KB. Avoid putting too many comments or
unnecessary historical information into the file. If the file is bigger than 250KB it
will be rejected by the IEC 61850 Protocol Ethernet Network card.
• The sAddr fields in each object of the .icd file must be preserved when generating
the .cid file. Do not change these, because they are used internally by the IEC
61850 server.
• If the .cid file has more than one IED definition block, the first one in the file will be
used by the network.
• Do not use non-ASCII characters in your .cid file (such as punctuation marks). Non-
ASCII characters can cause the parsing of the .cid file to fail.
• You do not need to reboot the Network Card or the Shark® 200 meter when the
.cid file is uploaded, unless the IP address has changed.
• If the uploaded .cid file has non-critical errors, the IEC 61850 Protocol Ethernet
Network card will use the file anyway and will start up. Any errors can be seen in
the Start Up log (see instructions below).
• If the uploaded .cid file has critical errors, the IEC 61850 will use the default .cid
file (not the uploaded file) and it will start up. The errors can be seen in the Start
Up log (instructions follow).
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
E: Using the IEC61850 Network Card
#
Doc
E149701
E-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents