Service: Current Only Measurement (Dual Phase) - Electro Industries Shark 200 Installation & Operation Manual

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

9. Service: Current Only Measurement (Dual Phase)

LINE
A
B
A
B
LOAD
Select: "3 EL WYE" (3 Element Wye) from the Shark® meter's front panel display (see
Chapter 6).
NOTE: Even if the meter is used only for current measurement, an AN reference is
recommended for improved accuracy.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
CT
Shorting
Block
Earth Ground
4: Electrical Installation
GND
L(+)
N(-)
lc
lb
la
Vref
Va
Vb
Vc
#
Doc
E149701
Power
Supply
Connection
FUSE
L(+)
3A
N(-)
20VAC
FUSE
Minimum
0.1A
4-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents