Electro Industries Shark 200 Installation & Operation Manual page 91

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

Click Communications. You will see the screen shown below. Use this screen to
enter communication settings for the meter's two on-board ports: the IrDA port (COM
1) and RS485 port (COM 2) Make any necessary changes to settings.
Valid Communication Settings are as follows:
COM1
Response Delay
COM2
Address
Protocol
Baud Rate
Response Delay
Parity
DNP Options for Voltage, Current, and Power - these fields allow you to choose Pri-
mary or Secondary Units for DNP, and to set custom scaling if you choose Primary.
Click the Optimal Scaling button to have the software choose a divisor for voltage,
current, and power, that will not result in an over/under-range.
NOTE: You must set the DNP polling software to multiply by the divisor amount
before showing the final value.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
(IrDA)
(0-750 msec)
(RS485)
(1-247; for DNP ONLY 1 - 65520)
(Modbus RTU, Modbus ASCII or DNP)
(1200 to 57600) Your meter must have Runtime Firmware version
26 or higher to set Baud rates of 1200, 2400, and 4800.
(0-750 msec)
(Odd, Even, or None) Your meter must have Runtime Firmware
version 26 or higher to be able to set Parity.
5: Communication Installation
#
Doc
E149701
5-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents