Electro Industries Shark 200 Installation & Operation Manual page 344

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

<Communication>
<SubNetwork name="Subnet_MMS" type="8-MMS">
<BitRate unit="b/s" multiplier="M">10</BitRate>
<ConnectedAP iedName="SHARK200IEC" apName="S1">
<Address>
<P type="OSI-PSEL" xsi:type="tP_OSI-PSEL">00000001</P>
<P type="OSI-SSEL" xsi:type="tP_OSI-SSEL">0001</P>
<P type="OSI-TSEL" xsi:type="tP_OSI-TSEL">0001</P>
<P type="IP" xsi:type="tP_IP">10.0.0.24</P>
</Address>
</ConnectedAP>
</SubNetwork>
</Communication>
<IED name="SHARK200IEC" desc="Electro Industries Shark 200" type="S200"
manufacturer="ElectroIndustries" configVersion="1.00">
<Services>
<DynAssociation/>
4. Once the System Integrator has processed the Shark® 200 meter's .icd file and
the information of the other devices on the network (using either automated tools
or manually), the final result is a configuration file with the extension ".cid". This
file must now be uploaded to the Shark® 200 meter's IEC 61850 Protocol Ethernet
network card.
5. To upload the .cid file, go to the IEC 61850 File Configuration screen shown in step
2.
6. Click the Browse button to locate the .cid file you want to upload.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
E: Using the IEC61850 Network Card
#
Doc
E149701
E-24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents