Shark 100T Transducer Installation - Electro Industries Shark 100 Installation & Operation Manual

Low cost, high performance multifunction electricity meter
Hide thumbs Also See for Shark 100:
Table of Contents

Advertisement

3.4: Shark 100T Transducer Installation

The Shark 100T Transducer model is installed using DIN Rail Mounting.
Specs for DIN Rail Mounting:
DIN Rail (Slotted) Dimensions:
DIN RAIL INSTALLATION STEPS:
1. Slide top groove of meter onto the DIN Rail.
2. Press gently until the meter clicks into place.
NOTE: If mounting with the DIN Rail provided,
use the Black Rubber Stoppers (also provided).
TO REMOVE METER FROM DIN RAIL:
Pull down on Release Clip to detach the unit from the
DIN Rail.
NOTE ON DIN RAILS:
DIN Rails are comonly used as a mounting channel for most
terminal blocks, control devices, circuit protection devices and
PLCs. DIN Rails are made of cold rolled steel electrolitically
plated and are also available in aluminum, PVC, stainless steel
and copper.
e
Electro Industries/GaugeTech
International Standards DIN 46277/3
0.297244" x 1.377953" x 3" (inches)
7.55mm x 35mm x 76.2mm (millimeters)
Release Clip
Figure 3.9: DIN Rail Mounting Procedure
Doc # E145701
Black Rubber Stoppers
Figure 3.10: DIN Rail Detail
3-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 100tShark 100

Table of Contents