E.2.3.2: Configuring The Meter On The Iec 61850 Network - Electro Industries Shark 200 Installation & Operation Manual

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

E.2.3.2: Configuring the Meter on the IEC 61850 Network

The System Integrator must configure the Shark® 200 meter within the substation
IEC 61850 network. To do this, the System Integrator needs the Shark® 200 capabil-
ities file (.icd) (as well as information about the rest of the devices in the network).
This .icd file, as mentioned earlier, is the SCL file that contains the IEC 61850 nodes,
objects, and parameters implemented in the Shark® 200 meter, including the Net-
work IP address.
This .icd file will be processed with the rest of the system (clients, other meters,
switches, breakers, etc., in the network) and the resulting file, which will be uploaded
to the meter to configure it, is the Configured IED Description file (.cid file).
The IP address for the Shark® 200 meter is contained in the Communication section
of this .cid file. See the example Communication section, below.
NOTE: If the CID file to be uploaded has more than one IED definition block, the
Shark® 200 meter will take the first one in the file.
<Communication>
<SubNetwork name="Subnet_MMS" type="8-MMS">
<BitRate unit="b/s" multiplier="M">10</BitRate>
<ConnectedAP iedName="SHARK200IEC" apName="S1">
<Address>
<P type="OSI-PSEL" xsi:type="tP_OSI-PSEL">00000001</P>
<P type="OSI-SSEL" xsi:type="tP_OSI-SSEL">0001</P>
<P type="OSI-TSEL" xsi:type="tP_OSI-TSEL">0001</P>
<P type="IP" xsi:type="tP_IP">172.20.167.199</P>
</Address>
</ConnectedAP>
</SubNetwork>
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
E: Using the IEC61850 Network Card
#
Doc
E149701
E-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents