Ct Leads Pass Through (No Meter Termination); Pass Through Wire Electrical Connection - Electro Industries Shark 200 Installation & Operation Manual

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

4.3: CT Leads Pass Through (No Meter Termination)

The second method allows the CT wires to pass through the CT inputs without termi-
nating at the meter. In this case, remove the current gills and place the CT wire
directly through the CT opening. The opening accommodates up to 0.177" / 4.5mm
maximum diameter CT wire.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
Figure 4.2: Pass Through Wire Electrical Connection
4: Electrical Installation
#
Doc
E149701
4-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents