Din Installation Steps; Figure 3.5: Ansi Installation - Electro Industries Shark 200 Installation & Operation Manual

Upgradeable fully featured power & energy meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

2. Secure from back of panel with flat washer, lock washer and nut on each threaded
rod. Use a small wrench to tighten. Do not overtighten. The maximum installation
torque is 0.4 Newton-Meter.

3.3: DIN Installation Steps

1. Slide meter with NEMA 12 Mounting Gasket into panel (remove ANSI Studs, if in
place).
2. From back of panel, slide 2 DIN Mounting Brackets into grooves in top and bottom
of meter housing. Snap into place.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
ANSI Installation

Figure 3.5: ANSI Installation

#
Doc
3: Mechanical Installation
4.0" Round form
ANSI Studs
E149701
3-4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents