3: Mechanical Installation
3.1: Introduction
The Shark® 200 meter can be installed using a standard ANSI C39.1 (4" round) or an
IEC 92 mm DIN (square) form. In new installations, simply use existing DIN or ANSI
punches. For existing panels, pull out old analog meters and replace them with the
Shark® 200 meter. See 3.4: Transducer Installation on page 3-6, for Shark® 200T
transducer installation. See 4.8: Electrical Connection Diagrams on page 4-8, for wir-
ing diagrams.
NOTE: The drawings shown below and on the next page give you the meter dimen-
sions in inches and centimeters [cm shown in brackets]. Tolerance is +/- 0.1" [.25
cm].
4.85 [12.32]
4.85 [12.32]
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
0.95 [2.41]
Figure 3.1: Meter Front and Side Dimensions
3: Mechanical Installation
0.06 [0.15]
Gasket
3.25 [8.26]
#
Doc
E149701
5.02 [12.75]
0.77 [1.95]
3-1