Chapter 3 Mechanical Installation - Electro Industries Shark 200 Installation & Operation Manual

Low-cost high performance multifunction electricity meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

3.1: Introduction
®
The Shark
200 meter can be installed using a standard ANSI C39.1 (4" Round) or an IEC 92mm DIN (Square)
form. In new installations, simply use existing DIN or ANSI punches. For existing panels, pull out old analog
meters and replace them with the Shark
®
3.4 for Shark
NOTE: The drawings shown below and on the next page give you the meter dimensions in inches and millimeters
(mm shown in brackets) Tolerance is +/- 0.1" [2.54 mm].
4.85 [123.19]
4.85 [123.19]
Figure 3.1: Meter Face
0.95 [24.04]
3.54 [89.92]
e
Electro Industries/Gauge Tech
Mechanical Installation
200T transducer installation. See Chapter 4 for wiring diagrams.
4.85 [123.19]
4.85 [123.19]
Gasket
0.06 [1.59]
5.02 [127.51]
3.25 [82.55]
0.77 [19.55]
3.54[89.92]
3.54[89.92]
4.85 [123.19]
0.91 [23.11]
Fig. 3.3: Transducer Dimensions
Chapter 3
®
200 meter. The various models use the same installation. See Section
0.95 [24.04]
0.95 [24.04]
3.54 [89.92]
3.54 [89.92]
3.25 [82.55]
Doc# E149701
0.06 [1.59]
Gasket
0.06 [1.59]
Gasket
5.02 [127.51]
3.25 [82.55]
3.25 [82.55]
0.77 [19.55]
Figure 3.2: Meter Dimensions
4.85 [123.19]
0.91 [23.11]
0.77[19.55]
5.02 [127.51]
0.77 [19.55]
4.85 [123.19]
0.91 [23.11]
3.25 [82.55]
3-1
3.25 [82.5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents