Alcatel-Lucent 1830 PSS-16 Maintenance And Trouble-Clearing User Manual page 507

1830 pss series photonic service switch
Table of Contents

Advertisement

Trouble-clearing procedures
PWRADJCOMMS
....................................................................................................................................................................................................................................
Service affecting?
Applicability
Corrective Action
At the end of each step wait to see if the fault clears. If not, continue with the next step.
...................................................................................................................................................................................................
1
Re-run the ingress line adjustment.
CLI
WEBUI
...................................................................................................................................................................................................
2
Repeat
...................................................................................................................................................................................................
Verify the local NE can communicate with the upstream NE. Correct the communications
3
problem with the upstream NE before proceeding to the next step. (Refer to procedures
for DCN setup, OSPF setup, and verifying that the OSC channel operates correctly.)
CLI
...................................................................................................................................................................................................
4
Repeat
...................................................................................................................................................................................................
If the upstream NE is undergoing discovery by an NMS system, wait for the NMS to
5
finish discovery, then re-run the ingress line adjustment (see
E
N D
O F
...................................................................................................................................................................................................
PWRADJFAIL
PWRADJFAIL (Power Adjustment Failure); PWRADJFAIL (No
....................................................................................................................................................................................................................................
1830 PSS-36/PSS–32/PSS-16/PSS-4
8DG60888CAAA Release 3.6.0 and 3.6.1
Issue 1 June 2011
No
A2325A, AHPHG, AHPLG, ALPHG, AM2017B, AM2125A,
AM2125B, AM2318A, AM2325B
config powermgmt ingress shelf slot adjust
Select the LD card, and click the Power Adjustment tab.
Ensure that the Perform In-Service Power Adjustment field is selected
(checkbox), and click OK.
Step 1
up to 10 times.
telnet IP address of upstream NE
Step
1.
S T E P S
PWRADJFAIL (Inter NE communication timeout blocking
Step
power adjustment)
1).
2-257

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1830 pss-321830 pss-361830 pss-4

Table of Contents