Alcatel-Lucent 1830 PSS-16 Maintenance And Trouble-Clearing User Manual page 492

1830 pss series photonic service switch
Table of Contents

Advertisement

Trouble-clearing procedures
OPRUNACHIEVE
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Determine the transponder line port that is connected to OT VA port, MVAC port, or
1
SVAC port.
CLI
WEBUI
This indicates the expected power, actual power, and what each OT or SVAC port is
connected to.
If the optical line to which the alarmed interface connects is Manual power managed,
enter (CLI)
If the Power Management Type is Manual, verify that the output power target set for the
encoder interface is consistent with the output power required by the Engineering
Planning Tool plan for the network. If necessary correct the target output power for the
interface and wait 5 minutes to see if the alarm clears.
...................................................................................................................................................................................................
Visually inspect the fiber connecting the transponder (OT) line port and OT VA, MVAC
2
or SVAC port. Check that the fiber is not being pinched or bent tightly. Ensure that the
fiber connectors are properly seated at the OT line out port or SVAC In, MVAC In, VA In
port, and any bulkhead connectors (if any) between them.
...................................................................................................................................................................................................
Using an optical power meter, measure the optical output power of the transponder to
3
ensure that the output power is within specification. Make this measurement as close as
possible to the output port of the transponder.
If...
the output power is within the acceptable
limits,
the output power is not within acceptable
limits,
....................................................................................................................................................................................................................................
2-242
show interface topology <shelf slot port>
show interface <shelf slot port>
Select
Connections
show interface powermgmt sh/sl/[Line|Lineout]
OPRUNACHIEVE (Channel Power Unachievable)
>
Physical Topology
.
Then...
continue with
the transponder port may be dirty. Clean and
inspect port, and measure the optical output
power of the transponder. Continue with
4.
Step
5.
1830 PSS-36/PSS–32/PSS-16/PSS-4
8DG60888CAAA Release 3.6.0 and 3.6.1
Issue 1 June 2011
Step

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1830 pss-321830 pss-361830 pss-4

Table of Contents