Choosing A Location For Your System - Zhone IMACS 8000 User Manual

Integrated access device
Table of Contents

Advertisement

Running Head
Chassis Installation
1. Choose a suitable location for the system, as described in this chapter.
2. Unpack and inspect the equipment for damage.
3. Mount the chassis on the desired surface (rack, tabletop, or wall).
4. Install the chassis ground connections.
5. Set the chassis jumper for U.S. or European operating voltage compliance.
6. Remove the power supply covers from the chassis.
7. Install the AC or DC power supplies.
8. Install an AC-to-DC converter (if necessary).
9. Install a ringing generator (if necessary).
10. Verify the voltage ratings of all power supplies in the chassis.
11. Verify the fuse ratings of the source power supply.
12. Install a CPU card.
13. Install the Interface card.
14. Install the WAN cards.
15. Install server cards, as required.
16. Install the user (voice, data, and alarm) cards, as required.
17. Install the power supply covers on the chassis.
18. Apply power to the system and verify the power LED states.
After successfully installing the system, configure the system for operations follows:
1. Connect a VT100-compatible terminal to the Interface card.
2. Log into the system, then register.
3. Set the Alarm Filters.
4. Configure the CPU card.
5. Configure the Interface card.
6. Configure the WAN cards.
7. Configure all other cards.
2.3.3

Choosing a Location for Your System

The 8000 requires a reasonably dust-free, static-free operating environment, such as a
computer room. Adequate ventilation is also required at the site. Do not install the chassis in
direct sunlight, which may increase the system's operating temperature and affect its
operation.
2-2
Model No.
System Installation
Reference Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents