Hardware - NEC Univerge SV9100 Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 2.0
S
2
SV9100 R
ECTION
2.1
2.2
2.3
2.4
2.5
SV9100 Networking Manual
EQUIREMENTS

Hardware

Each SV9100 Communications Server needs the following items:
GCD-CP10
GPZ-IPLE
Install the station/trunk blades as required for your configuration.
When installing a Secondary System in a NetLink network, and the Secondary
System has GCD-LCA blades, the GCD-LCA blades will come online and get
assigned ports before any GCD-DLCA blades.
Invalid data is displayed in the LCD of the terminal if Program 51-01 is enabled.
The VOIPDB daughter boards in the network do not need to have the same
capacity. However, any chassis which may be used as a Primary must have a
VOIPDB large enough to handle the required network resources. It is
recommended with this feature that the VOIPDB be the same as the largest
installed VOIPDB in the network.
Capacity
A maximum of 50 nodes (connected sites).
960 Extensions/400 Trunk ports (as allowed by hardware and licensing).
The maximum number of ports, receivers, conference groups, etc., is the same
as stand-alone communication server.
License
A NetLink License is required for the Primary System.
All licenses must be registered into the Primary System.
Refer to
Section 10 Licensing Control
Protocol
TCP/IP IPv4 (IPv6 available in a future release)
Determining System ID
NetLink allows connecting a maximum of 50 communication servers. To identify
the communication server, each communication server must have one unique
number between 1 and 50.
for more details.
10-3

Advertisement

Table of Contents
loading

Table of Contents