10
Applying Power and Logging
This chapter provides instructions and information for the following:
• Preparing to power on the library. See
• Connecting the library to power and performing the initial power on. See
Section 10.2 on page
• Logging into X-Link. See
10.1
Preparing to Power on the Library
Before powering on the library, check to make sure that all the hardware is installed
correctly and that the library is ready. Follow these steps:
1.
Make sure you have a power cord suitable for your input voltage and location (see
the XLS Library Product Specification).
2.
If you plan to connect the XLS to a UPS, obtain the UPS and UPS cable (see
Section 2.2 on page 2-4
3.
Open all doors on the library.
4.
Confirm the following:
– The shipment locks have been removed from the handler (see
– No cartridges are protruding from the cartridge slots.
– None of the tape drives contain a cartridge.
– The handler does not contain a cartridge.
– If a MEM is attached, the inner hard stop on the handler's X-axis has been
XLS Library Installation Manual
10-3.
page
4-1).
removed, enabling the handler to reach into the MEM. See
page
5-3.
Section 10.1
Section 10.3 on page
for additional information).
Into X-Link
10-12.
Section 4.1 on
Section 5.2 on
10-1