PREVENTIVE MAINTENANCE
4
.
Adjust the gap between the BUILDING EXHAUST DUCT and the DUCT from the
PROCESSOR to obtain the required static pressure.
DUCT DIAMETER
76 mm (3 in.)
102 mm (4 in.)
GAP
5
. Connect the EXHAUST HOSE to the EXHAUST CONNECTION of the PROCESSOR.
!
Caution
Do not run the X-OMAT MULTILOADER 300 as long the the pressure of the EXHAUST is not
correct ! Incorrect venting may cause serious damage to the X-OMAT MULTILOADER 300 !
KODAK AG, Stuttgart
NEGATIVE STATIC PRESSURE, WATER HEAD
0.76 mm (0.03 in.)
0.25 mm (0.01 in.)
MIN
BUILDING EXHAUST DUCT
DUCT FROM PROCESSOR
figure 10-7
10-9
SM 3058-6
MAX
1.02 mm (0.04 in.)
0.51 mm (0.02 in)
9/98