ML300 SN > 2000
When a CASSETTE is fed in, the CASSETTE OPENER ASSEMBLY moves down. As soon as
the GUIDE SHOES touch the rear wall of the CASSETTE TRANSPORT AREA (i.e. the wall
where the 3 CASSETTE IN END SWITCHES are mounted), the CASSETTE HOOK
ASSEMBLY is moved towards the FILM CHUTE. The CASSETTE HOOK ASSEMBLY
becomes blocked by the LOCK PLATE. The CASSETTE OPENER ASSEMBLY goes further
down to its bottom position, the PRESSURE BOLTS press on the CASSETTE to release the
tension on the CASSETTE LATCH.
CASSETTE HOOK ASSEMBLY
PRESSURE BOLT
GUIDE SHOE
KODAK AG, Stuttgart
LOCK PLATE
OPENER SOLENOID
figure 7-4
7-3
PRESSURE BOLT
SHOVEL HOOK
OPENER PIN
SHOVEL ASSEMBLY
SM 3058-6
RETAINER
9/98