Ct Leads Pass Through (No Meter Termination) - Electro Industries Shark 200 Installation & Operation Manual

Low-cost high performance multifunction electricity meter
Hide thumbs Also See for Shark 200:
Table of Contents

Advertisement

4.3: CT Leads Pass Through (No Meter Termination)

The second method allows the CT wires to pass through the CT Inputs without terminating at the meter. In this
case, remove the Current Gills and place the CT wire directly through the CT opening. The opening will accomo-
date up to 0.177" / 4.5mm maximum diameter CT wire.
CT Wire passing through meter
Current Gills removed
Figure 4.2: Pass-Through Wire Electrical Connection
4-3
e
Electro Industries/Gauge Tech
Doc# E149701

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 200t

Table of Contents