Automation Direct DURApulse GS4 User Manual page 426

Hide thumbs Also See for DURApulse GS4:
Table of Contents

Advertisement

Appendix A: Accessories
Frame G Conduit Box Installation (continued)
Fasten all the screws. Screw torque: 24~26 kg·cm (20.8~22.6 Ib·in).
Place the cover back to the top and fasten the screws (as shown in the figure).
Screw torque: 12~15 kg·cm (10.4~13 Ib·in).
Remove poWeR fRom dRIve pRIoR to INstAllAtIoN ANd/oR RemovAl of AccessoRIes.
DuRA
Page A–30
GS4 AC Drive User Manual – 1st Ed, Rev A - 10/20/2017
pulse

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the DURApulse GS4 and is the answer not in the manual?

Table of Contents

Save PDF