8.3
Fast OPR
Operation overview of the fast OPR
Fast OPR operation
After the OP position is established by performing a machine OPR, the positioning control to the OP position is executed
without using a near-point dog or zero signal.
The following shows the operation after the fast OPR is started.
1.
The fast OPR is started.
2.
The positioning control to the OP position established by a machine OPR operation is performed at the speed set in the
OPR parameter areas ([Pr.43] to [Pr.57]).
3.
The fast OPR is completed.
Machine OPR start
([Cd.184] Positioning start signal)
[Md.26] Axis operation status
Standby
[Pr.46] OPR speed
Position control
OP
Positioning to OP
Machine OP
(OP position)
Standby
M
8 OPR CONTROL
8
91
8.3 Fast OPR