Returning a Server to Operation

These topics explain how to return a Netra SPARC S7-2 server from Oracle to operation after
you perform service procedures.
Step
Task
1.
Install the air duct if you serviced these components:
■ PSU duct
■ DIMMs
■ LED board
2.
Install the PSU duct if you serviced these components:
■ Air duct
■ USB board
■ Motherboard
■ PDB
■ PDB signal cable
3.
Secure the drive cage if you serviced the components in Step 1,
Step 2, or the drive backplane.
4.
Install the fan tray if you serviced the components in Step 1,
Step 2, Step 3, or these components:
■ Drive signal cable
■ Drive power cable
5.
Install the top cover if you serviced the components in Step 1,
Step 2, Step 3, Step 4 or these components:
■ Fan modules
■ PCIe cards
■ Battery
6.
Install the server into the rack.
7.
Connect power cords to the server.
8.
Power on the server by one of two methods.
Link
"Install the Air Duct" on page 236
"Install the PSU Duct" on page 240
"Secure the Drive Cage" on page 241
"Install the Fan Tray" on page 244
"Install the Top Cover" on page 246
See
Netra SPARC S7-2 Server Installation Guide
server into the rack.
"Connect AC Power Cords" on page 249
"Power On the Server (Oracle ILOM)" on page 249
"Power On the Server (Power Button)" on page 250
Returning a Server to Operation