Oracle SPARC S7-2L Installation Manual

Oracle SPARC S7-2L Installation Manual

Hide thumbs Also See for SPARC S7-2L:
Table of Contents

Advertisement

Quick Links

SPARC S7-2L Server Installation Guide
Part No: E73200-02
June 2017

Advertisement

Table of Contents
loading

Summary of Contents for Oracle SPARC S7-2L

  • Page 1 SPARC S7-2L Server Installation Guide Part No: E73200-02 June 2017...
  • Page 3 Oracle. Oracle Corporation and its affiliates will not be responsible for any loss, costs, or damages incurred due to your access to or use of third-party content, products, or services, except as set forth in an applicable agreement between you and Oracle.
  • Page 4 Oracle Corporation et ses affiliés déclinent toute responsabilité ou garantie expresse quant aux contenus, produits ou services émanant de tiers, sauf mention contraire stipulée dans un contrat entre vous et Oracle. En aucun cas, Oracle Corporation et ses affiliés ne sauraient être tenus pour responsables des pertes subies, des coûts occasionnés ou des dommages causés par l'accès à...
  • Page 5: Table Of Contents

    Contents Using This Documentation .................  9 Product Documentation Library .................  9 Feedback .......................  9 Understanding the Server .................  11 Installation Task Overview ................ 11 Server Overview ...................  12 Front Panel Components With Eight-Drive Backplane (Installation) ...... 14 Front Panel Components With Twelve-3.5-Inch-Drive Backplane (Installation) .. 15 Front Panel Components With Twenty-Four-Drive Backplane (Installation) .... 17 Front Panel Components With Twelve NVMe Drive Backplane (Installation) .... 19 Rear Panel Components (Installation) ...............
  • Page 6 ▼ Configure the Preinstalled OS ............ 82 ▼ Reach a State to Install a Fresh OS (Oracle ILOM CLI) ...... 82 ▼ Reach a State to Install a Fresh OS (Oracle ILOM Web Interface) .... 84 Oracle Solaris OS Configuration Parameters ............ 86 ▼ Assign a Static IP Address to the NET MGT Port ..........  87 Oracle Auto Service Request Software Activation ..........
  • Page 7 Contents Index ........................ 91...
  • Page 8 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 9: Using This Documentation

    Audience – Technicians, system administrators, and authorized service providers. ■ Required knowledge – Advanced experience troubleshooting and replacing hardware. ■ Product Documentation Library Documentation and resources for this product and related products are available at http://www. oracle.com/goto/s7-2l/docs. Feedback Provide feedback about this documentation at http://www.oracle.com/goto/docfeedback. Using This Documentation...
  • Page 10 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 11: Understanding The Server

    Understanding the Server These topics list the installation tasks, provide an overview of the server, and highlight the key components. “Installation Task Overview” on page 11 ■ “Server Overview” on page 12 ■ “Front Panel Components With Eight-Drive Backplane (Installation)” on page 14 ■...
  • Page 12: Server Overview

    Attach data and management cables to the server. “Connecting Cables” on page 59 Connect the power cords to the server, configure the Oracle “Powering On the Server for the First Time” on page 75 ILOM on the SP, power on the server for the first time, and set up the operating system.
  • Page 13 Power supplies Two hot-swappable (1+1) AC 1100W power supplies. Cooling fans Four hot-swappable, redundant fan modules at chassis front (top-loading). Redundant fans in each power supply. Built into motherboard. Includes Oracle Integrated Lights Out Manager (Oracle ILOM). Understanding the Server...
  • Page 14: Front Panel Components With Eight-Drive Backplane (Installation)

    Locator button / Locator LED (white) Service Required LED (amber) Power LED (green) Power button SP Power OK button (green) Server serial number Drive 0 Drive 1 Drive 2 (or NVMe drive 0) SPARC S7-2L Server Installation Guide • June 2017...
  • Page 15: Front Panel Components With Twelve-3.5-Inch-Drive Backplane (Installation)

    Front Panel Components With Twelve-3.5-Inch-Drive Backplane (Installation) Description Drive 3 (or NVMe drive 1) Drive 4 (or NVMe drive 2) Drive 5 (or NVMe drive 3) Drive 6 Drive 7 Fan Fault LED (amber) PS Fault LED (amber) Overtemp LED (amber) USB 2.0 connectors (2) Related Information “Server Overview”...
  • Page 16 Overtemp LED (amber) PS Fault LED Fan Fault LED (amber) Related Information “Server Overview” on page 12 ■ “Rear Panel Components (Installation)” on page 20 ■ “Cabling Requirements” on page 59 ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 17: Front Panel Components With Twenty-Four-Drive Backplane (Installation)

    Front Panel Components With Twenty-Four-Drive Backplane (Installation) Front Panel Components With Twenty-Four-Drive Backplane (Installation) Description Locator button / Locator LED (white) Service Required LED (amber) Power LED (green) Power button SP Power OK button (green) Server serial number Drive 0 Drive 1 Drive 2 Drive 3 (or NVMe drive 0)
  • Page 18 Overtemp LED (amber) PS Fault LED (amber) Fan Fault LED (amber) Related Information “Server Overview” on page 12 ■ “Rear Panel Components (Installation)” on page 20 ■ “Cabling Requirements” on page 59 ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 19: Front Panel Components With Twelve Nvme Drive Backplane (Installation)

    Front Panel Components With Twelve NVMe Drive Backplane (Installation) Front Panel Components With Twelve NVMe Drive Backplane (Installation) Description Locator button / Locator LED (white) Service Required LED (amber) Power LED (green) Power button SP Power OK button (green) Server serial number NVMe drive 0 NVMe drive 1 NVMe drive 2...
  • Page 20: Rear Panel Components (Installation)

    You must follow the proper sequence when connecting cables to the server. Do not Note - connect the power cords until all data cables have been connected. Description Power supply 0 (PS 0) Power supply 1 (PS 1) SPARC S7-2L Server Installation Guide • June 2017...
  • Page 21 Rear Panel Components (Installation) Description PCIe slot 1 PCIe slot 2 PCIe slot 3 PCIe slot 4 PCIe slot 5 PCIe slot 6 Network 100/1000/10000 ports: NET 0 to NET 3 NET MGT RJ-45 network port SER MGT RJ-45 network port Note Some configurations provide slots for two rear 2.5-inch drives.
  • Page 22 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 23: Confirming Specifications

    Confirming Specifications These topics provide the technical information and airflow precautions you need to install the server. “Physical Specifications” on page 23 ■ “Electrical Specifications” on page 24 ■ “Environmental Specifications” on page 25 ■ “Airflow Precautions” on page 26 ■...
  • Page 24: Electrical Specifications

    (two 4.267-GHz S7 processors, eight 16-GB DDR4 DIMMs, no drives, one internal HBA card, and no PCIe cards). Peak AC input power running MGRID (minimum configuration) 591W Maximum heat dissipation 3576 BTU/hr 3772 KJ/hr SPARC S7-2L Server Installation Guide • June 2017...
  • Page 25: Environmental Specifications

    Environmental Specifications For information on power specifications, use the power calculator at: http://www.oracle.com/us/products/servers-storage/sun-power-calculators Related Information “Powering On the Server for the First Time” on page 75 ■ “Physical Specifications” on page 23 ■ “Environmental Specifications” on page 25 ■ “Airflow Precautions” on page 26 ■...
  • Page 26: Airflow Precautions

    “Physical ■ Specifications” on page Install the server so the front faces the cool aisle and the rear faces the warm aisle. ■ Do not direct warm air into the server. ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 27 Airflow Precautions Prevent recirculation of air within a rack or cabinet. ■ When servicing server internal components, ensure that air ducts, baffles, and filler panels ■ are properly installed. Route cables so they do not interfere with airflow. ■ Related Information “Rack Cautions”...
  • Page 28 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 29: Preparing For Installation

    Preparing for Installation These topics detail the precautions to follow and the tools to assemble prior to installing the server. Step Description Links Confirm that you received all the items you ordered. “Shipping Kit” on page 29 Review safety and ESD precautions “Handling Precautions”...
  • Page 30: Handling Precautions

    The server weighs approximately 60 lb (27.22 kg). Two people are required to lift Caution - and mount this 2U server into a rack enclosure when using the procedures in this document. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 31: Esd Precautions

    “Physical Specifications” on page 23 ■ “Installing the Server” on page 33 ■ SPARC S7-2L Server Getting Started Guide ■ ESD Precautions Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic wrist strap, foot strap, or equivalent safety equipment to prevent electrostatic damage when you install or service the servers.
  • Page 32 ■ Terminal server ■ Patch panel connected to a terminal server ■ Related Information “Handling Precautions” on page 30 ■ “ESD Precautions” on page 31 ■ SPARC S7-2L Server Service Manual ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 33: Installing The Server

    Installing the Server These topics describe how to install the server into a rack using the rail assembly in the rackmount kit. Perform these procedures if you purchased the rail assembly. Note - In this guide, the term "rack" means either an open rack or a closed cabinet. Step Description Links...
  • Page 34: Rack Compatibility

    Clearance width between front and rear Distance between structural supports and cable troughs is at least mounting planes 18 in. (456 mm). Server dimensions Depth: 29.0 in. (737 mm). Width: 17.5 in. (445 mm). SPARC S7-2L Server Installation Guide • June 2017...
  • Page 35: Rack Cautions

    Rack Cautions Item Requirement Height: 3.45 in. (87.6 mm). Related Information “Physical Specifications” on page 23 ■ “Handling Precautions” on page 30 ■ “Rack Cautions” on page 35 ■ Rack Cautions Equipment Loading. Always load equipment into a rack from the bottom up so that Caution - the rack does not become top-heavy and tip over.
  • Page 36: Stabilize The Rack

    If there are leveling feet beneath the rack to prevent it from rolling, extend these leveling feet fully downward to the floor. Install the rackmount hardware. “Install the Rackmount Hardware” on page SPARC S7-2L Server Installation Guide • June 2017...
  • Page 37: Install The Rackmount Hardware

    Install the Rackmount Hardware Related Information Rack documentation ■ SPARC S7-2L Server Safety and Compliance Guide ■ “Rack Compatibility” on page 34 ■ “Rack Cautions” on page 35 ■ Install the Rackmount Hardware Complete the following task to remove the mounting brackets from the slide rail assemblies before installation.
  • Page 38 Slide rail lock Mounting bracket Mounting bracket clip With the heads of the five chassis locating pins protruding through the five keyhole openings in the mounting bracket, pull the mounting bracket toward SPARC S7-2L Server Installation Guide • June 2017...
  • Page 39: Attach Slide Rail Assemblies To The Rack

    Attach Slide Rail Assemblies to the Rack the front of the chassis until the mounting bracket clip locks into place with an audible click. Verify that the rear locating pin has engaged the mounting bracket clip. Repeat Step 2 through Step 4 to install the remaining mounting bracket on the other side of the server.
  • Page 40 The bottom edge of the card corresponds to the bottom edge of the server. Measure up from the bottom of the installation card. Mark the mounting holes for the front slide rails. Mark the mounting holes for the rear slide rails. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 41 Attach Slide Rail Assemblies to the Rack Orient the slide rail assembly so that the ball-bearing track is forward and locked in place. Description Slide rail Ball-bearing track Locking mechanism Installing the Server...
  • Page 42 M6 mounting screws through both front and rear slide rail brackets and rack posts, and then secure the screws to the rack posts with the caged nuts. Repeat this procedure to attach the slide rail assembly to the other side of the rack. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 43: Install The Server Into The Slide Rail Assemblies

    Install the Server Into the Slide Rail Assemblies If available, extend the antitip legs or antitilt bar at the bottom of the rack. Refer to the documentation for the rack for instructions. Install the server into the slide rail assemblies. “Install the Server Into the Slide Rail Assemblies”...
  • Page 44 Continue pushing the server into the rack until the slide rail locks (on the front of the mounting brackets) engage the slide rail assemblies. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 45 Install the Server Into the Slide Rail Assemblies You hear an audible click when the slide rail locks are engaged. Verify that the server is securely mounted in the rack and that the slide rail locks are Caution - engaged with the mounting brackets before you install the optional CMA. (Optional) Attach the CMA.
  • Page 46: Cma Components

    The following figure shows the components of the optional CMA. Description Connector A Front slide bar Velcro straps (6) Connector B Connector C Connector D Slide rail latching bracket (used with connector D) SPARC S7-2L Server Installation Guide • June 2017...
  • Page 47: Prepare The Cma For Installation

    Prepare the CMA for Installation Description Rear slide bar Flat cable covers (not used with this server) Round cable covers Related Information “Prepare the CMA for Installation” on page 47 ■ “Attach the CMA to the Server” on page 49 ■...
  • Page 48 Using your thumb, apply downward pressure on each hinge connector to snap the hinge connector into place. Swing the cable covers down and press down on the cable cover handle to lock them into the closed position. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 49: Attach The Cma To The Server

    Attach the CMA to the Server Ensure that the six Velcro straps are threaded into the CMA as shown in Step Ensure that the two Velcro straps located on the front slide bar are threaded through the Note - opening in the top of the slide bar as shown in Step 2.
  • Page 50 Insert the CMA's connector B into the front slot on the right slide rail until it locks into place with an audible click (panels 1 and 2). The connector B tab goes into the slide rail's front slot (panel 1). SPARC S7-2L Server Installation Guide • June 2017...
  • Page 51 Attach the CMA to the Server Gently tug on the right side of the front slide bar to verify that connector B is properly seated. Description Connector B tab Right slide rail front slot Install the CMA's connector C into the right slide rail. Installing the Server...
  • Page 52 (panels 2 and 3). Gently tug on the right side of the CMA's rear slide bar to verify that connector C is properly seated. Prepare the CMA's connector D for installation. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 53 Attach the CMA to the Server Remove the tape that secures the slide rail latching bracket to connector D and ensure that the latching bracket is properly aligned with connector D (panels 1 and 2). Note - The CMA is shipped with the slide rail latching bracket taped to connector D. You must remove the tape before you install this connector.
  • Page 54 Verify that the slide rails and CMA operate properly. “Verify Operation of Slide Rails and CMA” on page Related Information “Prepare the CMA for Installation” on page 47 ■ “Secure Cables to the CMA” on page 72 ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 55: Verify Operation Of Slide Rails And Cma

    Verify Operation of Slide Rails and CMA Verify Operation of Slide Rails and CMA Two people are recommended for this procedure, one to move the server in and out of Note - the rack, and one to observe the cables and CMA. Slowly pull the server out of the rack until the slide rails reach their stops.
  • Page 56 Simultaneously push both of the green slide rail release buttons, and push the server completely into the rack until both slide rail locks engage. Adjust the cable straps and CMA, as required. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 57 Verify Operation of Slide Rails and CMA Related Information “Attach the CMA to the Server” on page 49 ■ “Secure Cables to the CMA” on page 72 ■ Installing the Server...
  • Page 58 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 59: Connecting Cables

    Connecting Cables These tasks describe how to connect cables before you attempt to boot the server. Step Description Links Review the cabling requirements. “Cabling Requirements” on page 59 Review the front and rear panel connectors and ports. “Front Panel Components With Eight-Drive Backplane (Installation)”...
  • Page 60: Identifying Ports

    Related Information “Server Overview” on page 12 ■ “Front Panel Components With Eight-Drive Backplane (Installation)” on page 14 ■ “Rear Panel Components (Installation)” on page 20 ■ “Cabling Requirements” on page 59 ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 61: Usb Ports

    “Cabling Requirements” on page 59 ■ SER MGT Port The SER MGT RJ-45 port, located on the rear panel, provides an TIA/EIA-232 serial Oracle/ Cisco standard connection to the SP. This port is the default connection to the Oracle ILOM Connecting Cables...
  • Page 62 DB-9 and DB-25 columns refer to the connector on the terminal side. This diagram is an example of an RJ-45 to DB-9 conversion. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 63: Net Mgt Port

    The NET MGT RJ-45 port, located on the rear panel, provides an optional Ethernet connection to the SP. The NET MGT port is an optional connection to Oracle ILOM on the SP. The SP NET MGT port uses an RJ-45 cable for a 10/100/1000BASE-T connection. If your network does not use a DHCP server, this port will not be available until you configure network settings through the SER MGT port.
  • Page 64: 10 Gigabit Ethernet Ports

    Four RJ-45 Ethernet ports (NET 0, NET 1, NET 2, NET 3) can be accessed from the rear panel. “Rear Panel Components (Installation)” on page 20. The Ethernet interfaces operate at 100 Mbps, 1000 Mbps, and 10000 Mbps. Signal Description Signal Description Transmit/Receive Data 0 + Transmit/Receive Data 2 – SPARC S7-2L Server Installation Guide • June 2017...
  • Page 65: Sas Ports

    Identifying Ports Signal Description Signal Description Transmit/Receive Data 0 – Transmit/Receive Data 1 – Transmit/Receive Data 1 + Transmit/Receive Data 3 + Transmit/Receive Data 2 + Transmit/Receive Data 3 – Related Information “Rear Panel Components (Installation)” on page 20 ■ “Connect Ethernet Network Cables”...
  • Page 66: Connecting Data And Management Cables

    “Connect the SER MGT Cable” on page 67 ■ “Connect the NET MGT Cable” on page 68 ■ “Connect Ethernet Network Cables” on page 70 ■ “Connect Other Data Cables” on page 71 ■ SPARC S7-2L Server Installation Guide • June 2017...
  • Page 67: Connect The Ser Mgt Cable

    Connect the SER MGT Cable Related Information “Front Panel Components With Eight-Drive Backplane (Installation)” on page 14 ■ “Rear Panel Components (Installation)” on page 20 ■ “Cabling Requirements” on page 59 ■ “Identifying Ports” on page 60 ■ Connect the SER MGT Cable The SP serial management port is labeled SER MGT.
  • Page 68: Connect The Net Mgt Cable

    Connect the NET MGT Cable The SP network management port is labeled NET MGT. After the initial server configuration, you can connect to the SP over an Ethernet network using this NET MGT port. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 69 Connect the NET MGT Cable If your network uses a DHCP server to assign IP addresses, the DHCP server assigns an IP address to this NET MGT port. With this IP address, you can connect to the SP using an SSH connection.
  • Page 70: Connect Ethernet Network Cables

    100 Mbps, 1000 Mbps, and 10000 Mbps. See, “Connect Ethernet Network Cables” on page The Oracle ILOM sideband management feature enables you to access the SP using one Note - of these Ethernet ports. Refer to “Connecting to the SP (In-band)” in SPARC and Netra SPARC S7-2 Series Servers Administration Guide.
  • Page 71: Connect Other Data Cables

    Connect Other Data Cables Connect a Category 5 (or better) cable from your network switch or hub to Ethernet Port 0 (NET 0) on the rear of the chassis. Connect Category 5 (or better) cables from your network switch or hub to the remaining Ethernet ports (NET 1, NET 2, and NET 3), as needed.
  • Page 72: Secure Cables To The Cma

    “Prepare the CMA for Installation” on page 47 “Attach the CMA to the Server” on page Open the cable covers and straps on the CMA. Route the server cables through the CMA cable covers and straps. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 73 Secure Cables to the CMA Secure the cables to the CMA by closing the covers and tightening the straps. Verify the operation of the slide rails and CMA. “Verify Operation of Slide Rails and CMA” on page Related Information “Attach the CMA to the Server” on page 49 ■...
  • Page 74 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 75: Powering On The Server For The First Time

    “Configure the Preinstalled OS” on page 82 Configure the preinstalled OS, or install a fresh “Configure the Preinstalled OS” on page 82 “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 84 Set the configuration parameters for the Oracle “Oracle Solaris OS Configuration Parameters”...
  • Page 76: Prepare The Power Cords

    (PC or workstation). The server goes into Standby mode and Oracle ILOM on the SP initializes as soon as a power cable connects a power supply to an external power source. System messages might be lost after 60 seconds if a terminal or terminal emulator is not connected to the SER MGT port before power is applied.
  • Page 77: Connect A Terminal Or Emulator To The Ser Mgt Port

    Connect a Terminal or Emulator to the SER MGT Port “Connect a Terminal or Emulator to the SER MGT Port” on page Related Information “Rear Panel Components (Installation)” on page 20 ■ “Powering On the Server for the First Time” on page 75 ■...
  • Page 78 When the power cords are connected, the SP initializes and the power supply LEDs illuminate. After a few minutes, the SP login prompt is displayed on the terminal device. At this time, the host is not initialized or powered on. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 79: Oracle Ilom System Console

    ■ Oracle ILOM System Console When you power on the server, the boot process begins under the control of the Oracle ILOM system console. The system console displays status and error messages generated by firmware- based tests that are run during system startup.
  • Page 80: Power On The System For The First Time

    Administrator account as soon as possible after your initial login to Oracle ILOM. If you find this default Administrator account has already been changed, contact your system administrator to obtain an Oracle ILOM user account with Administrator privileges.
  • Page 81: Installing The Os

    ■ “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 82 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 84 ■ Installing the OS Use these topics to either configure the preinstalled OS or use an alternative OS.
  • Page 82: Configure The Preinstalled Os

    Oracle Solaris OS parameters you must provide during initial configuration. Log in to the server. You can now enter Oracle Solaris OS commands at the prompt. For more details, refer to the Oracle Solaris 11 OS man pages and documentation at: http://www.oracle.com/goto/solaris11/docs Related Information “Prepare the Power Cords”...
  • Page 83 There are many methods by which you can install the OS. For example, you can boot and install the OS from USB flash media or from another server on the network. For more information about the methods, refer to Installing Oracle Solaris 11 Systems, comparing installation options at: http://www.oracle.com/goto/solaris11/docs...
  • Page 84: Reach A State To Install A Fresh Os (Oracle Ilom Web Interface)

    “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 82 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 84 ■ “Assign a Static IP Address to the NET MGT Port” on page 87 ■...
  • Page 85 Reach a State to Install a Fresh OS (Oracle ILOM Web Interface) In the Oracle ILOM web interface, in the left navigation pane, choose Host Management → Host Boot Mode. The Host Boot Mode page is displayed. For Script, type:...
  • Page 86: Oracle Solaris Os Configuration Parameters

    Accept the default date and time, or change the values. root Password Type the root password twice. This password is for the superuser account for the Oracle Solaris OS on this server. This password is not the SP password. SPARC S7-2L Server Installation Guide • June 2017...
  • Page 87: Assign A Static Ip Address To The Net Mgt Port

    “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 82 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 84 ■ Assign a Static IP Address to the NET MGT Port If you plan to connect to the SP through its NET MGT port, the SP must have a valid IP address.
  • Page 88 You can type the show /SP/network command again to verify that the parameters have Note - been updated. Set the static IP address when you configure the Oracle Solaris OS. “Configure the Preinstalled OS” on page SPARC S7-2L Server Installation Guide • June 2017...
  • Page 89: Oracle Auto Service Request Software Activation

    Oracle's qualified server, storage, and Engineered System products when specific faults occur. Parts are dispatched upon receipt of a service request sent by Oracle ASR. In many cases, Oracle engineers are already working to resolve an issue before you're even aware that a problem exists.
  • Page 90 Oracle Auto Service Request Software Activation Oracle Auto Service Request Documentation ■ http://docs.oracle.com/cd/E37710_01/index.htm How to Approve Pending ASR Assets In My Oracle Support (DOC ID 1329200.1) ■ https://support.oracle.com/rs?type=doc&id=1329200.1 Related Information Oracle Auto Service Request Documentation ■ http://docs.oracle.com/cd/E37710_01/index.htm SPARC S7-2L Server Installation Guide • June 2017...
  • Page 91 49 AC Present LED, location of, 20 configuring acoustic specifications, 25 information required, 59 adapter for serial cables, 67 Oracle Solaris, 86 airflow confirming specifications, 23 airflow guidelines, 26 cooling fans, 12 clearance, 23 CPU description, 12...
  • Page 92 23 Service Required, 14, 15, 17, 19 pinouts SP Fault, 14, 15, 17, 19 Ethernet ports, 64 NET MGT port, 63 SAS connector, 65 SER MGT port, 61 memory USB ports, 61 SPARC S7-2L Server Installation Guide • June 2017...
  • Page 93 Index Power button, location of, 14, 15, 17, 19 Server OK LED, 14, 15, 17, 19 power calculator, 24 service clearance, 23 power cords, cabling, 76 service processor power specifications, 24 show command, 87 power supplies Service Required LED, 14, 15, 17, 19 LEDs, 20 shipping kit contents, 29 location, 12...
  • Page 94 Index USB ports, 12 pinouts, 61 vibration specifications, 25 voltage specifications, 24 weight specification, 23 width specification, 23 SPARC S7-2L Server Installation Guide • June 2017...

Table of Contents