Oracle Netra SPARC S7-2 Installation Manual

Hide thumbs Also See for Netra SPARC S7-2:
Table of Contents

Advertisement

Quick Links

Netra SPARC S7-2 Server Installation
Guide
Part No: E73206-03
January 2017

Advertisement

Table of Contents
loading

Summary of Contents for Oracle Netra SPARC S7-2

  • Page 1 Netra SPARC S7-2 Server Installation Guide Part No: E73206-03 January 2017...
  • Page 3 Oracle. Oracle Corporation and its affiliates will not be responsible for any loss, costs, or damages incurred due to your access to or use of third-party content, products, or services, except as set forth in an applicable agreement between you and Oracle.
  • Page 4 Oracle Corporation et ses affiliés déclinent toute responsabilité ou garantie expresse quant aux contenus, produits ou services émanant de tiers, sauf mention contraire stipulée dans un contrat entre vous et Oracle. En aucun cas, Oracle Corporation et ses affiliés ne sauraient être tenus pour responsables des pertes subies, des coûts occasionnés ou des dommages causés par l’accès à...
  • Page 5: Table Of Contents

    Contents Using This Documentation .................  9 Understanding the Server .................  11 Installation Task Overview ................ 11 Server Overview ...................  12 Front Panel Components (Installation) ............... 14 Rear Panel Components (Installation) ...............  15 Confirming Specifications .................  17 Physical Specifications ...................  17 Electrical Specifications .................. 18 Input Power Information ................. 19 Overcurrent Protection Requirements .............. 20 DC Power Source, Power Connection, and Grounding Requirements ......
  • Page 6 ▼ Configure the Preinstalled OS ............ 86 ▼ Reach a State to Install a Fresh OS (Oracle ILOM CLI) ...... 87 ▼ Reach a State to Install a Fresh OS (Oracle ILOM Web Interface) .... 88 Oracle Solaris OS Configuration Parameters ............ 91 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 7 Contents ▼ Assign a Static IP Address to the NET MGT Port ..........  92 Oracle Auto Service Request Software Activation .......... 94 Index ........................ 97...
  • Page 8 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 9: Using This Documentation

    Using This Documentation Overview – Provides specifications and describes how to install and power on Oracle's ■ Netra SPARC S7-2 server for the first time. Audience – Technicians, system administrators, and authorized service providers. ■ Required knowledge – Experience installing hardware.
  • Page 10 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 11: Understanding The Server

    Perform the following tasks to install and configure the server. Step Description Links Review the product notes for any late-breaking news about the Netra SPARC S7-2 Server Product Notes server. Review the server features and familiarize yourself with the “Server Overview” on page 12 server components.
  • Page 12: Server Overview

    The CPU configuration is set at the factory. A single CPU server cannot be upgraded to a dual CPU configuration. Memory The number of DDR4-2400MHz DIMM slots depends on the CPU configuration.. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 13 ■ Four of the SFF slots can be used for NVMe SDDs Service processor On the motherboard, an internal SP with cryptographic acceleration that supports industry standard security ciphers. The SP runs Oracle ILOM firmware with provisions for: ■ Oracle ILOM 3.2.4 ■ Serial management (RJ-45) ■...
  • Page 14: Front Panel Components (Installation)

    “Servicing SAS Drives” in Netra SPARC S7-2 Server slots Service Manual Two USB 2.0 ports “USB Ports” on page 69 Serial number and manufacturing information “Find the Server Serial Number” in Netra SPARC S7-2 Server Service Manual Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 15: Rear Panel Components (Installation)

    Hot-swappable power supply (AC or DC), PS0 “Servicing Power Supplies” in Netra SPARC S7-2 Server Service Manual PCIe slots “Servicing PCIe Cards” in Netra SPARC S7-2 Server Service Manual Grounding studs “Connect the Chassis Ground Wire” on page 72 USB 3.0 port “USB Ports”...
  • Page 16 ■ Main Power OK LED Related Information “Installation Task Overview” on page 11 ■ “Server Overview” on page 12 ■ “Front Panel Components (Installation)” on page 14 ■ Netra SPARC S7-2 Server Service Manual ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 17: Confirming Specifications

    Confirming Specifications These topics provide information about the server specifications. “Physical Specifications” on page 17 ■ “Electrical Specifications” on page 18 ■ “Input Power Information” on page 19 ■ “DC Power Source, Power Connection, and Grounding Requirements” on page 21 ■...
  • Page 18: Electrical Specifications

    40-47 VDC (900W max out) Input current (maximum) 10A (100-127 VAC) 36A max @ -48 VDC bus 7A (200-240 VAC) 28A max @ -60 VDC bus Frequency (nominal) 50/60 Hz 0 Hz Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 19: Input Power Information

    Input Power Information Parameter Input treatment Isolated DC Return (DC-I) The ports of this equipment or subassembly are suitable for connection to intra- Caution - building or unexposed wiring or cabling only. The intra-building port(s) of the equipment or subassembly must not be metallically connected to interfaces that connect to the outside plant wiring.
  • Page 20: Overcurrent Protection Requirements

    However, you must consider the characteristics of the protection device and the applicable electrical codes when selecting the rating of a protection device for the product installation. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 21: Dc Power Source, Power Connection, And Grounding Requirements

    DC Power Source, Power Connection, and Grounding Requirements Overcurrent protection devices must meet applicable national and local electrical safety Note - codes, and be approved for the intended application. Related Information “Physical Specifications” on page 17 ■ “Electrical Specifications” on page 18 ■...
  • Page 22: Environmental Requirements

    Netra rackmounted servers are certified to meet these worst-case operating conditions Caution - only when using an approved rackmount kit. You must strictly follow the rackmounting instructions in order to meet these environmental specifications. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 23: Acoustic Noise Emissions

    Acoustic Noise Emissions Specification Operating Nonoperating † Ambient temperature Maximum: 5°C to 35°C (41°F to 113°F) up to 1829 meters −40°C to 70°C (−40°F to 158°F) ‡ (6000 feet) Optimal: 21°C to 23˚C (69.8°F to 73.4°F) Short-term maximum: -5°C to 55°C (23°F to 131°F) Relative humidity 5% to 85% RH, noncondensing, not to exceed 0.024 kg water/ 93%, non condensing, 40°C (104°F)
  • Page 24: Airflow Precautions

    Prevent recirculation of air within a rack or cabinet. ■ When servicing server internal components, ensure that air ducts, baffles, and filler panels ■ are properly installed. Route cables so they do not interfere with airflow. ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 25 Airflow Precautions Related Information “Physical Specifications” on page 17 ■ “Electrical Specifications” on page 18 ■ “Input Power Information” on page 19 ■ “DC Power Source, Power Connection, and Grounding Requirements” on page 21 ■ “Overcurrent Protection Requirements” on page 20 ■...
  • Page 26 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 27: Preparing For Installation

    Preparing for Installation These topics describe how to prepare to install the server. “Shipping Kit Inventory” on page 27 ■ “Handling Precautions” on page 28 ■ “ESD Precautions” on page 29 ■ “Tools Needed for Installation” on page 29 ■ Related Information “Understanding the Server”...
  • Page 28: Handling Precautions

    See “Physical Specifications” on page When completing a two-person procedure, always communicate your intentions Caution - clearly before, during, and after each step to minimize confusion. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 29: Esd Precautions

    ESD Precautions Related Information “Shipping Kit Inventory” on page 27 ■ “ESD Precautions” on page 29 ■ “Tools Needed for Installation” on page 29 ■ “Optional Components” on page 31 ■ “Rack Cautions” on page 32 ■ “Stabilize the Rack” on page 33 ■...
  • Page 30 “Handling Precautions” on page 28 ■ “ESD Precautions” on page 29 ■ “Optional Components” on page 31 ■ “Rack Cautions” on page 32 ■ “Stabilize the Rack” on page 33 ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 31: Installing The Server

    Installing the Server These topics describe how to install the server into an equipment rack. Step Description Links Install optional components. “Optional Components” on page 31 Review cautions. “Handling Precautions” on page 28 Stabilize the rack. “Stabilize the Rack” on page 33 Install the server in a rack.
  • Page 32: Rack Cautions

    (for example, use of power strips). Do not use slide rail mounted equipment as a shelf or a work space. Caution - Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 33: Stabilize The Rack

    Fully extend the rack cabinet's antitilt legs or antitilt bar, which are located at the bottom front of the rack cabinet. Related Information Documentation for your rack cabinet ■ Netra SPARC S7-2 Server Safety and Compliance Guide, Compliance Model No.: 9600 ■ “Shipping Kit Inventory” on page 27 ■ “Handling Precautions” on page 28 ■...
  • Page 34 “Install the Server (4-Post, 19-Inch Hardmount Rack Kit)” on page 36 ■ Related Information “Tools Needed for Installation” on page 29 ■ “Handling Precautions” on page 28 ■ “Rack Cautions” on page 32 ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 35: 19-Inch Hardmount Kit (4-Post Rack) Components

    Stabilize the Rack 19-Inch Hardmount Kit (4-Post Rack) Components Description Rear mount flanges (2) Screws Rear mount support brackets (2) Hardmount brackets (2) Installing the Server...
  • Page 36: Install The Server (4-Post, 19-Inch Hardmount Rack Kit)

    Remove the server from the rack, and place it on an antistatic mat. Remove the existing mounting brackets from the server and rack, if applicable. Secure the hardmount brackets to the sides of the server. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 37 Install the Server (4-Post, 19-Inch Hardmount Rack Kit) Use four M5 x 4.5 mm flathead Phillips screws for each bracket. Measure the depth of the rack. The measurement is used in the next step. Install the rear mount support brackets at the rear of the server, extending the rear mount support brackets to the measured depth of the rack.
  • Page 38 Use two to three of the supplied M4 x 0.5 x 5 mm panhead Phillips screws for each bracket, depending on the rack depth. Lift the server to the desired location in the rack. Secure the front of the hardmount brackets. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 39 Install the Server (4-Post, 19-Inch Hardmount Rack Kit) Use two screws for each post. Secure the rear mount support brackets to the rear of the rack. Use two screws for each rear mount support bracket. Installing the Server...
  • Page 40: Installing The 19-Inch Sliding Rail Kit With The Cma

    “Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit)” on page 42 ■ Related Information “Tools Needed for Installation” on page 29 ■ “Handling Precautions” on page 28 ■ “Rack Cautions” on page 32 ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 41: 19-Inch Sliding Rail Kit With The Cma Components

    Installing the 19-Inch Sliding Rail Kit With the CMA 19-Inch Sliding Rail Kit With the CMA Components Description Threaded screw plates (4) Screw and nut packages Cable management arm Rear L-brackets (2) Front L-Brackets (2) Slide assemblies (2) Glide assemblies (2) Hardmount brackets (2) from standard rail kit Installing the Server...
  • Page 42: Install The Server (4-Post, 19-Inch Sliding Rails With Cma Rack Kit)

    Open the standard hardmount rail kit and the sliding rail kit with the CMA, and confirm that all of the components are present. Remove the hardmount brackets and four M5 x 4.5 mm flathead Phillips screws from the standard hardmount kit. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 43 Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit) Attach the front, right and left hardmount brackets to the sides of the server. Use four M5 x 4.5 mm flathead Phillips screws for each side. Disassemble the sliding rails by pressing the release buttons and pulling the rail glides out of the sliding rails.
  • Page 44 Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit) Use four M5 x 4.5 mm panhead screws for each rail glide. Loosely install the L-brackets to the sliding rails. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 45 Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit) Use four M5 x 12 mm panhead screws, four flat washers, four star washers, and four nuts for each L-bracket. Loosely install the threaded screw plate and cage nuts in the four posts at the appropriate height.
  • Page 46 Align the cage nuts with the screw holes in the hardmount bracket (upper and lower). The security screws go through each of the hardmount brackets and into the cage nuts mounted to the rails. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 47 Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit) Install the sliding rail, L-bracket assemblies into the threaded screw plates. Secure the L-bracket assemblies to the posts. Tighten the sliding rail screws. Installing the Server...
  • Page 48 Press the release buttons, and slide the server completely into the rack. Attach the right and left sides of the CMA to the rear of the slide assembly (right) and server (left). Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 49 Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit) The green, spring-loaded handles should point inward. Pull the green handles out and release it when the holes are aligned. The left CMA flange fits into key-hole notches on the end of the left glide rail.
  • Page 50 Install the Server (4-Post, 19-Inch Sliding Rails With CMA Rack Kit) Route and secure the cables in the CMA. Install the security screws to secure the server into the rack. Illustration is shown without the slide rails for clarity. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 51: Installing The 19-Inch Hardmount Kit (2-Post Rack)

    Installing the 19-Inch Hardmount Kit (2-Post Rack) Consider your next step: For an existing server, return the server to operation by following the steps ■ in the service manual. For a new server, continue the installation by following the steps in this ■...
  • Page 52: 19-Inch Hardmount Rack Kit (2-Post Rack) Components

    “Install the Server (2-Post, 19-Inch Hardmount Rack Kit)” on page 53 ■ “Tools Needed for Installation” on page 29 ■ “Handling Precautions” on page 28 ■ “Rack Cautions” on page 32 ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 53: Install The Server (2-Post, 19-Inch Hardmount Rack Kit)

    Install the Server (2-Post, 19-Inch Hardmount Rack Kit) Install the Server (2-Post, 19-Inch Hardmount Rack Kit) The 19-inch, 2-post rackmount kit supports rack web thicknesses (the width of the rack Note - post) of 3 in. (76.20 mm), 4 in. (101.6 mm), and 5 in. (127 mm). You must install the server into a rack following these instructions for the 2-post, Caution - 19-inch hardmount kit.
  • Page 54 Use four M5 x 7 SEM screws for each side bracket. Lift the server into the rack. Using two screws for each bracket, secure the front of the server to the front of the rack. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 55 Install the Server (2-Post, 19-Inch Hardmount Rack Kit) The size of the screws varies, depending on your rack. (Optional) If your environment contains especially high vibrations, use the rear plates to further secure the server to the rack. The rear plates attach to the rear of the post and to one of the three sets of eyelets on each side bracket, depending on the thickness of the post.
  • Page 56 For example, this figure shows where to install the screws for the optimum rack position on the rear plate. Slide the rear plate in so that the screws slide into position into one set of the eyelets. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 57 Install the Server (2-Post, 19-Inch Hardmount Rack Kit) The screw heads should be facing the rear of the server. The other side of the rear plate should be in front of the rack post. Tighten the screws to secure the rear plate to the set of eyelets on the side bracket.
  • Page 58 For an existing server, return the server to operation by following the steps ■ in the service manual. For a new server, continue the installation by following the steps in this ■ guide. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 59 Install the Server (2-Post, 19-Inch Hardmount Rack Kit) Related Information “Tools Needed for Installation” on page 29 ■ “Handling Precautions” on page 28 ■ “Rack Cautions” on page 32 ■ Installing the Server...
  • Page 60 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 61: Connecting Cables

    Connecting Cables Perform the following tasks to connect and configure the network and serial ports before you apply power to the server. Step Description Links Review the available connections. “Available Connections” on page 61 Cable the SP. “Cable the SP” on page 64 “SER MGT Port”...
  • Page 62 DHCP services or assigned a static address in the OS). ■ Additional cables and Ethernet addresses as needed for additional connections to NET 1 - 3. For pinout information, see “10 Gigabit Ethernet Ports” on page Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 63: Connecting Data And Management Cables

    ■ An Ethernet cable to connect to the NET MGT RJ-45 connector. This port supports remote connections to port to your network. the SP using the Oracle ILOM CLI and web interface. ■ An IP address for this port (required from DHCP or a static address) By default, this port is configured to use DHCP or an IPv6 router to automatically obtain an IP address.
  • Page 64: Cable The Sp

    “10 Gigabit Ethernet Ports” on page The Oracle ILOM sideband management feature enables you to access the SP using Note - one of these Ethernet ports. Refer to the Oracle ILOM Administor's Guide for Configuration and Maintenance For Release 3.2.x at http://www.oracle.com/goto/ilom321/docs instructions.
  • Page 65: Connect Other Data Cables

    Connect Other Data Cables Connect a Category 6 (or better) cable from your network switch or hub to Ethernet port 0 (NET 0) on the rear of the chassis. (Optional) Connect Category 6 (or better) cables from your network switch or hub to the remaining Ethernet ports.
  • Page 66: Ser Mgt Port

    ■ SER MGT Port The SER MGT RJ-45 port, located on the rear panel, provides an TIA/EIA-232 serial Oracle/ Cisco standard connection to the SP. For DTE-to-DTE communications, you can use the supplied RJ-45 to DB-9 crossover adapter with a standard RJ-45 cable to achieve the required null modem configuration.
  • Page 67: Net Mgt Port

    Connect Other Data Cables Do not attach a modem to this port. Caution - Related Information “Available Connections” on page 61 ■ “Rear Panel Components (Installation)” on page 15 ■ “NET MGT Port” on page 67 ■ “10 Gigabit Ethernet Ports” on page 68 ■...
  • Page 68: Gigabit Ethernet Ports

    10GBASE-T 10000 Mbits/sec The Oracle ILOM sideband management feature enables you to access the SP using Note - one of these Ethernet ports. Refer to the Oracle ILOM Administor's Guide for Configuration and Maintenance For Release 3.2.x at http://www.oracle.com/goto/ilom321/docs instructions.
  • Page 69: Usb Ports

    Connect Other Data Cables Signal Description Signal Description Transmit/Receive Data 0 - Transmit/Receive Data 1 - Transmit/Receive Data 1 + Transmit/Receive Data 3 + Transmit/Receive Data 2 + Transmit/Receive Data 3 - Related Information “Available Connections” on page 61 ■ “Rear Panel Components (Installation)”...
  • Page 70 ■ “Rear Panel Components (Installation)” on page 15 ■ “SER MGT Port” on page 66 ■ “NET MGT Port” on page 67 ■ “10 Gigabit Ethernet Ports” on page 68 ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 71: Powering On The Server For The First Time

    “Configure the Preinstalled OS” on page 86 Configure the preinstalled OS, or install a fresh “Configure the Preinstalled OS” on page 86 “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 88 Set the configuration parameters for the Oracle “Oracle Solaris OS Configuration Parameters”...
  • Page 72: Connect The Chassis Ground Wire

    Insert the grounding wire into the barrel receptacle of the grounding lug, and use a crimping tool or solder gun to secure the wire. Go to the back of the server and locate the two grounding studs. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 73 Connect the Chassis Ground Wire Position and align the grounding lug on the two grounding studs at the rear of the chassis. Description Earth ground cable secured in the grounding lug M5 nuts Secure the grounding lug to the grounding studs using the two M5 nuts. Secure the other end of the grounding wire to the earth ground in the building.
  • Page 74: Connect Ac Power Cords

    (PC or workstation). The server goes into Standby mode and Oracle ILOM on the SP initializes as soon as a power cable connects a power supply to an external power source. System messages might be lost after 60 seconds if a terminal or terminal emulator is not connected to the SER MGT port before power is applied.
  • Page 75: Assembling And Connecting Dc Power Cords

    Assembling and Connecting DC Power Cords Do not attach the power cords to the power supplies at this time. Connect a device to the SER MGT port. “Connect a Terminal or Emulator to the SER MGT Port” on page Related Information “Connect the Chassis Ground Wire”...
  • Page 76: Assemble The Dc Input Power Cords

    Locate the three wires coming from your DC power source that will be used for the connections to your server. -48V or -60V Return (positive terminal) ■ -48V or -60V (negative terminal) ■ Chassis ground ■ Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 77 Assemble the DC Input Power Cords Depending on the DC power source, the positive terminal might be marked with a Note - positive (+) symbol, and the negative terminal might be marked with a minus (-) symbol. Strip 1/2 in. (13 mm) of insulation from each of the wires. Do not strip more than 1/2 in.
  • Page 78 Observing correct polarity designations for the attached cords, use the lug nuts to install the ring terminal barrels to the three terminal posts. Verify that the cords are installed with the correct polarities. Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 79 Assemble the DC Input Power Cords Install the terminal housing cover. Insert the completed power supply unit into the server. Repeat this procedure to create as many DC power supply units as you need for your system. Connect the DC power source. “Connect DC Power Source”...
  • Page 80: Connect Dc Power Source

    System messages might be lost after 60 seconds if a terminal or terminal emulator is not connected to the SER MGT port before power is applied. Oracle ILOM will signal a fault if power is not applied to both supplies, because that is a Note - nonredundant condition.
  • Page 81: Connect A Terminal Or Emulator To The Ser Mgt Port

    Connect a Terminal or Emulator to the SER MGT Port Connect a Terminal or Emulator to the SER MGT Port Prior to powering on the server for the first time, make a serial connection to the SP. After making this serial connection, you will be able to view the system messages when you connect the power cords.
  • Page 82: Oracle Ilom System Console

    ■ Oracle ILOM System Console When you power on the server, the boot process begins under the control of the Oracle ILOM system console. The system console displays status and error messages generated by firmware- based tests that are run during system startup.
  • Page 83: Power On The Server For The First Time

    Administrator account as soon as possible after your initial login to Oracle ILOM. If you find this default Administrator account has already been changed, contact your system administrator to obtain an Oracle ILOM user account with Administrator privileges.
  • Page 84 Are you sure you want to start /System (y/n)? y The server initialization might take several minutes to complete. To cancel the initialization, press the #. (Hash+Dot) keys to return to the Oracle ILOM prompt. Then type: stop /System (Optional) Redirect the host output to display on the serial terminal device.
  • Page 85: Disable Nebs Mode

    ■ “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 87 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 88 ■ Disable NEBS Mode NEBS mode is enabled by default, which places the maximum power state to P7, so that the server will not reduce speed when high temperatures are detected.
  • Page 86: Installing The Os

    Oracle Solaris OS parameters you must provide during initial configuration. Log in to the server. You can now enter Oracle Solaris OS commands at the prompt. For more details, refer to the Oracle Solaris 11 OS man pages and documentation at: http://www.oracle.com/goto/solaris11/docs Related Information “Connect AC Power Cords”...
  • Page 87: Reach A State To Install A Fresh Os (Oracle Ilom Cli)

    There are many methods by which you can install the OS. For example, you can boot and install the OS from DVD media or from another server on the network. For more information about the methods, refer to Installing Oracle Solaris 11 Systems, comparing installation options at: http://www.oracle.com/goto/Solaris11/docs...
  • Page 88: Reach A State To Install A Fresh Os (Oracle Ilom Web Interface)

    “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 87 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 88 ■ “Assign a Static IP Address to the NET MGT Port” on page 92 ■...
  • Page 89 For more information about the methods, refer to Installing Oracle Solaris 11 Systems, comparing installation options at: http://www.oracle.com/goto/solaris11/docs If you have not done so, perform these tasks to access the Oracle ILOM web interface on the server. In a browser on the same network as the system, type the IP address.
  • Page 90 “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 87 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 88 ■ “Assign a Static IP Address to the NET MGT Port” on page 92 ■...
  • Page 91: Oracle Solaris Os Configuration Parameters

    Accept the default date and time, or change the values. root Password Type the root password twice. This password is for the superuser account for the Oracle Solaris OS on this server. This password is not the SP password. Related Information Oracle Solaris OS documentation ■...
  • Page 92: Netra Sparc S7-2 Server Installation Guide • January

    “Reach a State to Install a Fresh OS (Oracle ILOM CLI)” on page 87 ■ “Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)” on page 88 ■ Assign a Static IP Address to the NET MGT Port If you plan to connect to the SP through its NET MGT port, the SP must have a valid IP address.
  • Page 93 You can type the show /SP/network command again to verify that the parameters have Note - been updated. Set the static IP address when you configure the Oracle Solaris OS. “Configure the Preinstalled OS” on page Related Information Server Administration ■...
  • Page 94: Oracle Auto Service Request Software Activation

    Oracle's qualified server, storage, and Engineered System products when specific faults occur. Parts are dispatched upon receipt of a service request sent by Oracle ASR. In many cases, Oracle engineers are already working to resolve an issue before you're even aware that a problem exists.
  • Page 95 Oracle Auto Service Request Software Activation Oracle Auto Service Request Documentation ■ http://docs.oracle.com/cd/E37710_01/index.htm How to Approve Pending ASR Assets In My Oracle Support (DOC ID 1329200.1) ■ https://support.oracle.com/rs?type=doc&id=1329200.1 Related Information Oracle Auto Service Request Documentation ■ http://docs.oracle.com/cd/E37710_01/index.htm Powering On the Server for the First Time...
  • Page 96 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 97: Index

    Ethernet ports, 64 cabling Ethernet ports, 64 power cords, 74 SP, 64 acoustic noise emissions, 23 Category 6 cables, 64 activate, Oracle Auto Service Request, 94 cautions airflow DC power, 21 precautions, 24 rack, 32 ambient temperature, 22 chassis ground posts, 15...
  • Page 98 82 installing 19-inch sliding rails with CMA, 42 mat, 29 2-post, 19-inch hardmount kit, 51, 53 precautions, 29 OS, 86 Ethernet ports, 12, 15, 61 slide rail kit with CMA, 40 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 99 Index insulation rating, 21 installing a fresh OS (Oracle ILOM CLI), 87 inventory, shipping kit, 27 installing a fresh OS (Oracle ILOM web IP address interface), 88 assign static to NET MGT port, 92 IP addresses, 61 configuring preinstalled, 86...
  • Page 100 81 stripping DC wires, 76 server supported, 12 applying DC power, 80 cooling fans, 12 confirming site and server specifications, 17 Ethernet ports, 12 depth, 17 optical media, 12 features, 12 Netra SPARC S7-2 Server Installation Guide • January 2017...
  • Page 101 Index PCIe slots, 12 power supplies, 12 SP, 12 storage, 12 USB ports, 12 surge protector, 19 switches, 12 System OK LED, 14, 15 task overview, installation, 11 Telco alarm LEDs, 14 temperature ambient, 22 specifications, 22 terminal device, 29 tools installation, 29 U.S.
  • Page 102 Netra SPARC S7-2 Server Installation Guide • January 2017...

Table of Contents