Returning the Server to Operation

This section describes how to return the server to service after performing cold service.
Description
Steps for returning the server to operation
after cold service.
Steps for server power-on options.

Prepare the Server for Operation

Use this procedure to return the server to an operational state after performing cold service.
1.
Ensure that all external front and rear components are fully installed.
Ensure that all cables are connected to the rear of the server.
2.
Connect all AC power cables to their inlets on the rear of the server and verify
3.
that they are locked.
The retaining clips lock the power cables and prevent accidental disconnect.
To ensure redundancy, power for the server should come from at least two separate circuits.
If necessary, connect the other end of the AC power cables to the supply outlet.
4.
Ensure that the server is powering into standby power mode.
5.
When AC power is applied to the server power inlets, the server boots into standby
power mode. For information, see
Indicators" on page
Verify that none of the server Service Action Required indicators on externally
6.
facing indicator panels are lit.
Link
"Prepare the Server for Operation" on page 235
"Power On the Server" on page 236
"Server Boot Process and Normal Operating State
59.
Returning the Server to Operation
235