Verify A Power Supply - Oracle Netra SPARC S7-2 Service Manual

Hide thumbs Also See for Netra SPARC S7-2:
Table of Contents

Advertisement

Verify a Power Supply

4.
Connect the power cord.
For AC power supply, see
For DC power supply, see
S7-2 Server Installation
Tip -
the main circuit breaker, you can reuse the already assembled power cord. In this scenario,
transfer the existing cords to the replacement power supply. Be sure to follow the safety
instructions and guidelines.
5.
If you installed a power supply as part of another component's removal or
installation procedure, return to that procedure.
See
"Component Service Task Reference" on page 47
6.
Complete these tasks in this order to finish the installation.
See:
"Returning a Server to Operation" on page 235
"Verify a Power Supply" on page 138
Related Information
"Remove a Power Supply" on page 134
"Verify a Power Supply" on page 138
"Preparing for Service" on page 43
"Returning a Server to Operation" on page 235
Verify a Power Supply
After you install a power supply, you can verify its functionality.
1.
Access Oracle ILOM.
See
"Log In to Oracle ILOM (Service)" on page
Reset the power supply.
2.
-> set /SYS/PSx clear_fault_action=true
Are you sure you want to clear /SYS/PS0 (y/n)? y
138
Netra SPARC S7-2 Server Service Manual • February 2017
"Connect AC Power Cords" on page
"Assembling and Connecting DC Power Cords" in Netra SPARC
Guide.
If the fault is with the server's power supply unit and not with the power cord from
249.
for assistance.
26.

Advertisement

Table of Contents
loading

Table of Contents