Returning The Server To Operation; Server Filler Panel Requirements; Remove And Install Filler Panels - Oracle X8-2L Service Manual

Table of Contents

Advertisement

Returning the Server to Operation

After replacing components inside of the server, perform the procedures in the following
sections:
"Server Filler Panel Requirements" on page 217
"Remove and Install Filler Panels" on page 217
"Install the Server Top Cover" on page 218
"Remove Antistatic Measures" on page 219
"Reinstall the Server Into the Rack" on page 219
"Return the Server to the Normal Rack Position" on page 220
"Reconnect Power and Data Cables" on page 222
"Power On the Server" on page 222

Server Filler Panel Requirements

The server might be shipped with module-replacement filler panels for storage drives and PCIe
cards. These filler panels are installed at the factory and must remain in the server until you
replace them with a purchased option.
Before you can install an optional server component into the server, you must remove the filler
panel from the location into which you intend to install the component. When you remove
a storage drive or a PCIe card from the server, you must install either a replacement for the
component removed or a filler panel.

Remove and Install Filler Panels

See the procedures in the following table to remove and install filler panels for
storage drives and PCIe cards.
Returning the Server to Operation
217

Advertisement

Table of Contents
loading

Table of Contents