Install the Battery

Install the Battery
1.
Unpack the replacement battery.
Press the new battery into the battery retainer with the positive side (+) facing
2.
inside the server chassis.
3.
Return the server to operation.
a.   
Lower the air baffle to the installed position.
b.   
Install the server top cover.
See
Return the server to the normal rack position.
c.   
See
d.   
Reconnect the power cords to the server power supplies, and power on the
server.
See
Server" on page
Note -
the Network Time Protocol (NTP), the Oracle ILOM SP clock will be reset as soon as the
server is powered on and connected to the network; otherwise, proceed to the next step.
4.
If the service processor is not configured to use NTP, you must do one of the
following:
Reset the Oracle ILOM SP clock using the Oracle ILOM CLI or the web interface.
For instructions, refer to the Oracle Integrated Lights Out Manager (ILOM) 3.2
Documentation Library at http://www.oracle.com/goto/ILOM/docs.
Use the BIOS Setup Utility to reprogram the host clock.
For the BIOS Main menu that supports this procedure, refer to the Oracle X5 Series Servers
Administration Guide at http://www.oracle.com/goto/x86AdminDiag/docs.
Related Information
"Remove the Battery" on page 126
128
Oracle Server X5-2L Service Manual • May 2015
"Install the Server Top Cover" on page
"Return the Server to the Normal Rack Position" on page
"Reconnect Power and Data Cables" on page 233
233. Verify that the power supply AC OK LED is lit.
If the service processor is configured to synchronize with a network time server using
226.
231.
and
"Power On the

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the X5-2L and is the answer not in the manual?

Table of Contents