Install the Battery
Install the Battery
1.
Insert the new battery with the positive side facing out.
2.
Install the SP back into the server.
See
"Install an SP or SPP" on page
If the SP is configured to synchronize with a network time server using the Network Time
Protocol, the Oracle ILOM clock will be reset as soon as the server is powered on and
connected to the network.
3.
Verify that the fault has been cleared and the replaced component is operational.
250
SPARC M8 and SPARC M7 Servers Service Manual • September 2017
136.
Need help?
Do you have a question about the SPARC M8 and is the answer not in the manual?
Questions and answers