For instructions on reconnecting cables to the rear of the server, see
"Reconnect Power and Data Cables" on page
For detailed information on connecting cables to the rear of the server, refer
to
"Rear Cable Connections and Ports" in "Oracle Server X5-2L Installation
Guide
Related Information
"Remove the Server From the Rack" on page 63
"Reconnect Power and Data Cables" on page 233

Return the Server to the Normal Rack Position

If the server is in the extended maintenance position, use this procedure to return the server to
the normal rack position.
1.
Push the server back into the rack, as described in the following steps.
Simultaneously pull and hold the two green release tabs (one on each side
a.   
of the slide rails on the server) toward the front of the server while you push
the server into the rack.
As you push the server into the rack, verify that the cable management arm (CMA) retracts
without binding.
To pull the green release tab, place your finger in the center of the tab, not on the end,
Note -
and apply pressure as you pull the tab toward the front of the server.
".
Return the Server to the Normal Rack Position
233.
Returning the Server to Operation
231

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the X5-2L and is the answer not in the manual?

Questions and answers

Table of Contents