Install The Battery - Oracle X7-2L Service Manual

Hide thumbs Also See for X7-2L:
Table of Contents

Advertisement

Install the Battery

1.
Unpack the replacement battery.
Press the new battery into the battery retainer.
2.
If disconnected during battery removal, reconnect the auxiliary signal cable to the disk
Note -
backplane and the SAS cables to the Internal HBA. For more information, see
Disk Backplane (FRU)" on page 157
3.
Return the server to operation.
Install the server top cover.
a.
See
"Install the Server Top Cover" on page
b.
Return the server to the normal rack position.
See
"Return the Server to the Normal Rack Position" on page
c.
Reconnect the power cords to the server power supplies, and power on the
server.
See
"Reconnect Power and Data Cables" on page 216
Server" on page
If the service processor is configured to synchronize with a network time server using
Note -
the Network Time Protocol (NTP), the Oracle ILOM SP clock will be reset as soon as the
server is powered on and connected to the network; otherwise, proceed to the next step.
4.
If the service processor is not configured to use NTP, you must do one of the
following:
Reset the Oracle ILOM SP clock using the Oracle ILOM CLI or the web interface.
Refer to the Oracle Integrated Lights Out Manager (ILOM) 4.0 Documentation Library at
http://www.oracle.com/goto/ilom/docs.
Use the BIOS Setup Utility to reprogram the host clock.
Refer to the Oracle X7 Series Servers Administration Guide at
goto/x86admindiag/docs.
Related Information
"Remove the Battery" on page 139
and
"Servicing SAS Cables (FRU)" on page
216. Verify that the power supply AC OK LED is lit.
212.
214.
and
"Power On the
http://www.oracle.com/
Servicing the Battery (CRU)
Install the Battery
"Servicing the
187.
141

Advertisement

Table of Contents
loading

Table of Contents